
6-6 POWER UNIT
FINAL ASSEMBLY CHECK
Perform the following checks in order to ensure proper and safe
operation of the repaired unit.
• All parts removed have been returned to the original posi-
tions.
• Lower unit gear engagement is properly adjusted.
(See page 8-19.)
• Fuel hose routing matchs service manual illustration.
(See page 9-2.)
• Wire routing matchs service manual illustration.
(See page 9-3.)
• No fuel leakage is evident.
• No water leakage is evident during final test running.
Summary of Contents for DF 25
Page 1: ...99500 97J00 01E Printed in Japan TK K6 9 9 5 0 0 9 7 J 0 0 0 1 E ...
Page 87: ...POWER UNIT 6 21 17 Remove a screw S and the reed valve T ...
Page 147: ...Prepared by Service Department May 2006 Manual No 99500 97J00 01E Printed in Japan 148 ...
Page 148: ...99500 97J00 01E Printed in Japan TK K6 9 9 5 0 0 9 7 J 0 0 0 1 E ...