
4E-70 ABS:
2
1) Remove the meter panel. Refer to “Meter Panel
Removal and Installation” in Section 9D in related
manual.
2) Check the ABS control unit coupler for loose or poor
contacts.
If OK, then disconnect the ABS control unit coupler.
Refer to “ABS Control Unit Coupler Disconnect and
Connect (AN400A/ZAK9)” (Page 4E-71).
3) Measure the voltage between “8” (R/Bl) and “24” (B/W)
at the coupler.
Special tool
(A): 09900–25008 (Multi circuit tester set)
Tester knob indication
Voltage (
)
Normal value (“8” – “24”)
Battery voltage (12.0 V and more)
ABS control unit coupler (Harness side)
Is the voltage between “8” and “24” normal?
Replace the ABS
control unit/HU.
Inspect the wire
harness. (Faulty
solenoid or ground wire)
Step
Action
Yes
No
24
25
18
10
12
13
16
2
3
4
21
(
ޓ
)
8
9
(
ޓ
)
(A)
(A)
I718H1450096-02
Summary of Contents for 2009 AN400
Page 4: ......
Page 16: ...0C 4 Service Data ...
Page 26: ...1G 3 Fuel System ...
Page 142: ...Prepared by April 2009 Part No 99501 34170 01E Printed in Japan 140 ...
Page 143: ...Printed in Japan K9 ...