18
②
Attach a new O-Ring to the O-Ring groove of valve and
adjust it until it can be fitted to the groove.
③
Before starting operation, perform the conduct leakage
inspections to check that no abnormality can be detected.
・
You are recommended to perform the conduct leakage
inspections in two different stages, low-pressure 20 - 30k Pa (2.9
– 4.3Psi)condition and high-pressure condition 400k Pa(58.0Psi).
―
Jig List Table
―
Model Type
Jig Name
QCH-6P/6S QCH-25AP/25AS
QCH-40AP/40AS
Stopper turning jig
Specify the jig name, connector size, and plug-use or socket-use
(e.g., for 6P plug, specify "stopper turning jig for flange-type 6P plug").
Surface-alignment
checking jig
SI-1385
SI-1386
SI-1387
O-Ring detaching jig
Specify "Q030-003."
7-2 Daily Inspections
Before starting operation and after completing operation,
perform the daily inspections checking the following points
against product. Whenever any abnormalities detected, you
must take an appropriate correcting action.
●
Can you see any foreign particles, dust, or dirt on the product?
●
Can you find any leakage from tubes or connector joints?
Summary of Contents for QCH-F
Page 21: ...21 memo...