396-4519Y1 Sentinel NH3 Blockage Monitor
6
Revised 01/26/2022
© 2016-2022 SurePoint Ag Systems Inc.
General Description
You have purchased a SurePoint Sentinel NH3 blockage system for your equipment. This
system will be controlled by the Sentinel ECU through your in-cab ISO display. Your
anhydrous system will continue to function as usual with application rates being regulated
by your existing rate controller. The Sentinel NH3 works independently, monitoring the row-to-row accuracy
of your system and alerting the operator of blocked rows.
SurePoint currently supports Sentinel operating on the following displays:
John Deere
2630 & 4640,
Ag
Leader
InCommand 800 and 1200,
Case IH
Pro 700,
Trimble
Fm2050 and FMX1000. The use of Sentinel
NH3 on any other display may result in diminished functionality.
A 2-pin Molex power and 12-pin Ampseal Power/CAN connector are required on your implement to connect
the Sentinel ECU to the implement bus. While some equipment manufacturers already provide this
connection, SurePoint offers harnessing to provide this connection on any implement. Ask your SurePoint
representative what accommodations may be needed for your specific equipment.
A
Introduction
Basic Installation Steps
1. Install all Row sensors using the guidelines laid out in the Applicator Plumbing Requirements section on
page 7.
2. Locate the 2-pin Molex power and 12-pin Ampseal POWER/CAN connectors (typically next to the rate
controller) that the Sentinel ECU will be connected to and remove the terminator. If you can’t identify
these connectors, call SurePoint. Save the terminator for Step 5.
3. Mount the Sentinel ECU using the provided bracket in a location within 4 feet of the above connection.
4. Attach the ECU harness (208-06-3536Y2) to the Sentinel ECU and plug the other end of the harness into
the above Molex/Ampseal POWER/CAN connection.
5. Use the previously removed terminator to terminate the POWER/CAN connection found on the ECU
harness.
6. Mount the SurePoint NH3 Temperature Interface module (226-01-4210Y1) to the back of the ECU
bracket used in step 2.
7. Plug the 4-pin Deutsch connector on the temperature interface module into the Flowmeter Bus 1.
8. Unplug the 3-pin Weather Pack dust plug that is connected to the temperature interface module and save.
9. Use a 3-pin Weather Pack extension cable (206-03-XXXX) to connect the temperature interface module
to the row sensor mounted on Row 1.
10. Make sure all row sensors are daisy chained together, using 3-pin Weather Pack extension cables to get
from NH3 manifold to NH3 manifold.
11. Install the 3-pin Weather Pack dust cover removed in step 8 and install it on the last row.