22
Figure 3-36 Opening for Air Intake
Two Required
Figure 3-35: Opening for Air Outtake
10. Once the chase has been built, locate the linear duct/louver adapter outlet and cut an opening on the chase
finishing material of
30.75” (W) X 4.5” (H) centered with the outlet (Figure 3-35).
11. Determine the two locations of the air intakes on the chase and cut the rectangular openings of 15.2
5” (W) X
4
.5” (H) (Figure 3-36).
Note: A distance of 5 inches is required from the floor.
12. From the exterior of the chase, fasten the LV3210 linear front outtake louver and the two LV1610 intake
grilles (Refer to Table 3-7).