16
/
40
Super Snow
4.Hoses and clamp installation
Note: after the clamp is installed, both sides should
be symmetrical.(the pipe is pressed evenly and
beautiful on the hose fitting)
Should put POE oil on the fittings:
1
、
Can improve the sealing effect of O - ring
2
、
Can prevent the O-ring from being broken when
installation
3
、
Drier is last step for connecting, open time can be
over 1min