2-2
S
UPER
S
ERVER
5010H/5010E
Manual
Choosing a Setup Location:
- Leave enough clearance in front of the rack to enable you to open
the front door completely (~25 inches).
- Leave approximately 30 inches of clearance in the back of the rack
to allow for sufficient airflow and ease in servicing.
Rack Precautions:
- Ensure that the leveling jacks on the bottom of the rack are fully
extended to the floor with the full weight of the rack resting on them.
- In single rack installation, stabilizers should be attached to the rack.
- In multiple rack installations, the racks should be coupled together.
- Always make sure the rack is stable before extending a component
from the rack.
- You should extend only one component at a time - extending two or
more simultaneously may cause the rack to become unstable.
Server Precautions:
- Review the electrical and general safety precautions in Chapter 4.
- Determine the placement of each component in the rack
before
you
install the rails.
-
Install the heaviest server components on the bottom of the rack
first, and then work up.
- Use a regulating uninterruptible power supply (UPS) to protect the
server from power surges, voltage spikes and to keep your
system operating in case of a power failure.
-
Allow the hot plug SCSI drives (5010H) and power supply units to
cool before
touching them.
-
Always keep the rack's front door and all panels and components on
the servers closed when not servicing to maintain proper cooling.
!
!
Warnings and Precautions!
Summary of Contents for SUPERSERVER 5010E
Page 10: ...Notes SUPERSERVER 5010H 5010E User s Manual x...
Page 18: ...SUPERSERVER 5010H 5010E Manual 1 8 NOTES...
Page 30: ...2 12 SUPERSERVER 5010H 5010E Manual Notes...
Page 38: ...SUPERSERVER 5010H 5010E Manual 4 4 Notes...
Page 72: ...6 10 SUPERSERVER 5010H 5010E Manual Notes...
Page 112: ...SUPERSERVER 5010H 5010E User s Manual 7 40 BIOS Notes...
Page 124: ...SUPERSERVER 5010H 5010E Manual B 10 Notes...