49
Chapter 3: Maintenance and Component Installation
C
D
A
B
4. With a T30-bit screwdriver, tighten all peek nuts in the sequence of "A", "B", "C", and
"D" with even pressure. To avoid damaging the processor or socket, do not use a force
greater than 12 lbf-in when tightening the screws.
5.
Examine all corners heatsink to ensure that the PHM is firmly attached to the CPU
socket.