
SuperStorageServer SSG-6119P-ACR12N4L User's Manual
22
Figure 2-2. Installing the Outer Rails to the Rack
Insert the top hook first, push it
downwards to allow its hook to rest and
engage the selected mounting hole.
1
A
When the top hook is rested and engaged into
place, push the bottom lock into the lower hole
until it clicks and snaps into place
Insert until bottom lock snaps into place.
This push button will pop out to indicate it is
locked.
Top hook
Bottom lock
This illustration shows a sideways view of one
properly mounted rail.
1
B