Installing the Outer Rails
Begin by measuring the distance from the front rail to the rear rail of the rack. Attach
a short bracket to the front side of the right outer rail and a long bracket to the rear
side of the right outer rail. Adjust both the short and long brackets to the proper
distance so that the rail can fit snugly into the rack. Secure the short bracket to the
front side of the outer rail with two screws and the long bracket to the rear side of
the outer rail with three screws. Repeat these steps for the left outer rail.
Locking Tabs:
Both chassis rails have a locking tab, which serves two functions.
The first is to lock the server into place when installed and pushed fully into the
rack, which is its normal position. Secondly, these tabs also lock the server in place
when fully extended from the rack. This prevents the server from coming completely
out of the rack when you pull it out for servicing.
Figure 2-2. Installing the Rack Rails
2-5 Installing the System into a Rack
This section provides information on installing the 6018R-TDTP/TDTPR into a rack
unit with the rack rails provided. If the system has already been mounted into a
rack, you can skip ahead to Sections 2-5 and 2-6.
There are a variety of rack units on the market, which may mean the assembly
procedure will differ slightly. You should also refer to the installation instructions that
came with the rack unit you are using.
Identifying the Sections of the Rack Rails
You should have received two rack rail assemblies in the rack mounting kit. Each
assembly consists of two sections: an inner fixed chassis rail that secures directly
to the server chassis and an outer fixed rack rail that secures directly to the rack
itself (see Figure 2-1). Two pairs of short brackets to be used on the front side of
the outer rails are also included.
Installing the Inner Rails
Both the left and right side inner rails have been pre-attached to the chassis. Pro-
ceed to the next step.
Figure 2-1. Identifying the Sections of the Rack Rails
(right side rail shown)
Warning:
do not pick up the server with the front handles. They are de-
signed to pull the system from a rack only.
Slide rail mounted equipment is not to be used as a shelf or a work space.
Stability hazard. The rack stabilizing mechanism must be in place, or the
rack must be bolted to the floor before you slide the unit out for servicing.
Failure to stabilize the rack can cause the rack to tip over.
Summary of Contents for SUPERSERVER 6018R-TDTP
Page 1: ...SUPERSERVER 6018R TDTP 6018R TDTPR USER S MANUAL 1 0a...
Page 9: ...1 6 SUPERSERVER 6018R TDTP TDTPR User s Manual Notes...
Page 14: ...2 8 SUPERSERVER 6018R TDTP TDTPR User s Manual Notes...
Page 42: ...5 26 SUPERSERVER 6018R TDTP TDTPR User s Manual Notes...
Page 49: ...6 12 SUPERSERVER 6018R TDTP TDTPR User s Manual Notes...
Page 70: ...7 40 SUPERSERVER 6018R TDTP TDTPR User s Manual Notes...
Page 72: ...A 2 SUPERSERVER 6018R TDTP TDTPR User s Manual Notes...
Page 75: ...B 4 SUPERSERVER 6018R TDTP TDTPR User s Manual Notes...