3-9
Chapter 3: Setup and Installation
7.
With the CPU inside the socket, inspect the four corners of the CPU to make sure
that the CPU is properly installed.
8.
Close the load plate with the CPU inside the socket (
). Lock the lever
labeled 'Close 1st' first (
), then lock the lever labeled 'Open 1st' second
). Use your thumb to gently push the load levers down to the lever
locks.
Figure 3-9. Closing the Load Plate
Figure 3-10. Locking the Close First Lever
Figure 3-11. Locking the Open 1st Lever
OPEN 1st
OPEN
1st
Push down and lock the
level labeled 'Close 1st'.
OPEN 1st
OPEN
1st
OPEN 1st
OPEN
1st
Push down and lock the
lever labeled 'Open 1st'
Lever Lock
Summary of Contents for SBI-7127RG-E
Page 1: ...SBI 7127RG E Blade Server Module User s Manual Revison 1 0...
Page 4: ...SBI 7127RG E Blade Server Module User s Manual iv Notes...
Page 8: ...SBI 7127RG E Blade Server Module User s Manual viii Notes...
Page 30: ...SBI 7127RG E Blade Server Module User s Manual 2 18 Notes...
Page 33: ...3 3 Chapter 3 Setup and Installation Figure 3 1 Inserting a Blade into the Enclosure...
Page 74: ...SBI 7127RG E Blade Server Module User s Manual 5 18 Notes...
Page 84: ...SBI 7127RG E Blade Server Module User s Manual A 10 Notes...
Page 86: ...SBI 7127RG E Blade Server Module User s Manual 0 2 Notes...