2-6
S
UPER
S
ERVER 5025M-4/5025M-i Manual
Figure 2-3. Installing the Server into a Rack
Installing the Server into the Rack
You should now have rails attached to both the chassis and the rack unit. The next
step is to install the server into the rack. Do this by lining up the rear of the chas-
sis rails with the front of the rack rails. Slide the chassis rails into the rack rails,
keeping the pressure even on both sides (you may have to depress the locking
tabs when inserting). See Figure 2-3.
When the server has been pushed completely into the rack, you should hear the
locking tabs "click". Finish by inserting and tightening the thumbscrews that hold
the front of the server to the rack.
Summary of Contents for 5025M-4
Page 1: ...SUPERSERVER 5025M 4 SUPERSERVER 5025M i USER S MANUAL 1 0 SUPER...
Page 5: ...v Preface Notes...
Page 10: ...SUPERSERVER 5025M 4 5025M i User s Manual x Notes...
Page 18: ...SUPERSERVER 5025M 4 5024M i Manual 1 8 Notes...
Page 32: ...SUPERSERVER 5025M 4 5025M i User s Manual 3 4 Notes...
Page 92: ...A 2 SUPERSERVER 5025M 4 5025M i User s Manual Notes...
Page 98: ...B 6 SUPERSERVER 5025M 4 5025M i User s Manual Notes...
Page 116: ...C 18 SUPERSERVER 5025M 4 5025M i User s Manual Notes...
Page 120: ...D 4 SUPERSERVER 5025M 4 5025M i User s Manual Notes...