background image

Rail

Parts

SC 31 

Rail  Profile

SC 32

Side Rail Cap

Middle Rail Cap

Side Rail Cap

SC 41

Front

Fixed 

Panel 

List of Parts

5

List of Parts

6

Summary of Contents for SKYCLOUD MAXI

Page 1: ...Assembly Instructions SKYCLOUD Bioclimatic System Four Seasons Comfort MAXI...

Page 2: ...p 5 Introduction Section View List of Parts Step 1 Water Drainage Parts Page Page Page Page Step 2 Step 3 Step 4 Step 5 Page Page Page Page Installing General Frame Step 1 Content List 01 02 03 09 21...

Page 3: ...r purchasing Sunset Pergola Product These instructions include helpful hints and important information needed to safely assemble and properly main tain the Product Please read these instructions compl...

Page 4: ...ile SC 13 Pillar Front Cap SC 22 Front Back Gutter Cap SC 21 Gutter Profile SC 12 Pillar Top Cap SC 16 Filter Set SC 14 Water Exiting Parts SC 17 Pillar Pipe Connector SC 15 Pillar Pipe Quantity of pa...

Page 5: ...Rail Parts SC 31 Rail Profile SC 32 Side Rail Cap Middle Rail Cap Side Rail Cap SC 41 Front Fixed Panel List of Parts 5 List of Parts 6...

Page 6: ...SC 42 Main Panel SC 43 Back Fixed Panel List of Parts 7 List of Parts 8...

Page 7: ...tem standing and one person for installing your connectors for the ground surface For concrete surfaces Concrete Screw Buldex is enough But for soft ground you need to use Expansions Bolts For making...

Page 8: ...s process important because of the next steps of the installation 180 Degree System Projection System Width STEP 1 11 Use Spirit Level for to be sure every pillars is perpendicular with ground level C...

Page 9: ...before moving on to other stages Use Concrete Screw Buldex from 3 or 4 point to install to the wall as shown in the picture 5 cm Concrete Screw Buldex 7 5x10 or 12 Torx 14 5 cm 7 2 cm Step 1 4 Connec...

Page 10: ...16 Step 1 5 STEP 1 15 Step 1 5 Assembly left and right parts Rails SC 31 to the SC 11 in the same way 8x30 Hexagon head Bolt Use special screws 8x25 hexagon head bolt and wrench depending on where to...

Page 11: ...n the last cassete and front casste you will see placement of the rails Place rail like shown on the picture and check slope of the rails and dimension between pillars and compare with project plan Ri...

Page 12: ...an add all screw for the pillars ground connections Soft Grounds Concrete Grounds Threaded Rod Somun Concrete Screw Buldex 7 5x10 or 12 Torx Step 4 2 At this step you will add first water exiting deta...

Page 13: ...mm Hex key Use Hex Key to complete the panel loading as shown in the picture STEP 2 22 Step 2 2 Install every panel SC 41 starting from back Move small parts to the cassettes holes Step 2 1 STEP 2 21...

Page 14: ...degree If your angle is less than or more than 90 degree you need to check connections again 2 Secondly your diagonal dimensions between two corners must be equal D1 D2 3 Thirdly every piece of the p...

Page 15: ...king with fixed first and last panels STEP 2 26 Step 2 3 After finalize panel installation pull out the cassette pins This is important if you will forget to this procedure After the electrical connec...

Page 16: ...load 1500N in push pull Maximum speed at full load 7 9mm s with 1500N in a push or pull condition Stroke 20 200mm Minimum installation dimension 160mm Color Black or grey IP Rating Up to IP66 Operatio...

Page 17: ...1 Motors Output Cable Connection Point Electrical Steps Electrical Steps 1 Timotion Lineer Actuator Depend on your project your system maybe with a single motor or double motor Motors already installe...

Page 18: ...or the Double Motor System Cable Connection for the Double Motor System 3 Main Supply 220 V 50Hz 2 Motor Control Box 1 Motors Output Cable Connection Point 1 Timotion Lineer Actuator Electrical Steps...

Page 19: ...g all motor cables you can test your panels working But the important note is that don t forget to remove PINS Check all the pins if you will remove one of the panels and will install again Need to ad...

Page 20: ...LED Single Ambient Plan view Led Linear Lighting Types Installation LED Single Ambient LED Multi Ambient LED RGB Ambient LED Downlight Panel Downlight...

Page 21: ...LED RGB Ambient LED Multi Ambient Plan view Led Linear Plan view Led Linear...

Page 22: ...LED Downlight Plan view Lineer Downlight Panel Downlight Plan view Panel Downlight...

Page 23: ...hting Box profiles numbered A 1 A 2 A 3 A4 clockwise Project Lighting Plan Install small aparatus first Use 3 9x13 self drill screws for installation Leave 13 mm gap at the bottom Install inside surfa...

Page 24: ...hing aparatus connect Lighting Box on these as shown on the plan Check placement from plan twice Project Lighting Plan Connect Lighting Box profiles of electricity connection from the corners with usi...

Page 25: ...x 75 Isolated Cable depens on your lighting system For both cable connections explained detailed below Led Linear Ambient Downlight SpotLight Connections Plan Led Linear Ambient Downlight SpotLight Co...

Page 26: ...et your product You will see 2 isolated cable Black 2x0 75 3x0 75 4x 75 Isolated Cable depens on your lighting system For both cable connections explained detailed below Side Gutter Panels 5 RGB Recei...

Page 27: ...rieties as below For AC INPUT cable recomended as 3x1 5 isolated TTR cable for your safety The black 2x0 75 3x0 75 4 x0 75 isolated TTR cable is belong to the LED 1 Single System and single color 2 Si...

Page 28: ...3 While pressing CCT button turn on the electricity Step 4 Press ON button 3 times Step 1 Turn off the local electricity Step 2 Press and hold CCT button Step 3 While pressing CCT button turn on the...

Page 29: ...T Matching Zone operation for RGB color remote controller Step 1 Connection to load to the receiver and power on it The clearing operation should be finished within 1 minute after the receiver is powe...

Page 30: ...t the front Gutter Caps SC 22 to the front gutters as shown in the picture Insert the front Gutter Caps SC 22 to the back gutters as shown in the picture System Front Side System Front Side System Bac...

Page 31: ...shown in the picture And make the connection stronger with the screws type 3 5x19 3 5x19 Self Drill STEP 4 57 Step 4 3 Insert the Panel Front Connector SF 41 inside of the Gutter Cap SC 22 as shown in...

Page 32: ...r exiting details This is the small box SC 14 include its own cap with the hole Install this water existing box with M6 20 Allen Head with Hex Key STEP 5 60 STEP 4 59 Step 4 5 Insert Rail Cap SC 32 pr...

Page 33: ...sealant to the back side place between SC 43 and back Gutter of the SC 43 as shown on the left STEP 5 61 Step 5 2 At this step you will add another water exiting details Add water drainage plastic pi...

Page 34: ...wn in the picture and use 3mm Hex Key to secure in place 3mm Hex key STEP 5 63 Step 5 4 At this step you will connect pillars front SC 12 and upper caps SC 13 Use 4 2 x25 Torx screws and Drill for con...

Page 35: ...ene profiles that will be added to the system in line with your demand will perfectly enable both heat and sound isolation at the ceiling panels Advantages of Use In our SkyCloud product the aluminum...

Page 36: ...Customer service support sunsetpergola com tr...

Reviews: