![SUNSET SKYCLOUD MAXI Assembly Instructions Manual Download Page 23](http://html1.mh-extra.com/html/sunset/skycloud-maxi/skycloud-maxi_assembly-instructions-manual_1400007023.webp)
Electrical Steps
Electrical Steps
A-2
A-3
A-4
A-1
Front
Back
Project Lighting
Plan
You can see the SkyCloud plan
example left side of the page.
This is an example with 4 pillars type.
Lighting Box profiles numbered
A-1, A-2, A-3, A4 clockwise.
Project Lighting
Plan
Install small aparatus first.
Use 3.9x13 self drill screws
for installation. Leave
13 mm
gap at
the bottom. Install inside surface
of the Gutter and Rail profiles every
1 meter
as show below.
13 mm
Rail
Gutter
13 mm
1000 mm (1m)
1000 mm (1m)
1000 mm (1m)
1000 mm (1m)
1000 mm (1m)
1000 mm (1m)
3.9x13 screw
3.9x13 screw
13 mm
Summary of Contents for SKYCLOUD MAXI
Page 1: ...Assembly Instructions SKYCLOUD Bioclimatic System Four Seasons Comfort MAXI...
Page 6: ...SC 42 Main Panel SC 43 Back Fixed Panel List of Parts 7 List of Parts 8...
Page 21: ...LED RGB Ambient LED Multi Ambient Plan view Led Linear Plan view Led Linear...
Page 22: ...LED Downlight Plan view Lineer Downlight Panel Downlight Plan view Panel Downlight...
Page 36: ...Customer service support sunsetpergola com tr...