background image

LASER CHILLER OPERATORS MANUAL  

LASER CHILLER OPERATORS MANUAL  

LASER CHILLER OPERATORS MANUAL  

1.Water tank Cover

2.

3.

Temp.Controller panel

Lock

 

catch

Front/Top

4

5

6

7

8

4

.Water outlet

5

.Water

 

inletl

6

.Drain

Back

7.Signal wire hole

8.Wheel

3

16

3

1

2

7.2  Cooling system

Fan

Drier

/

Filter

Cooling

 

Solenoid

 

Valve

Capillary

Bypass

 

Solenoid

 

Valve

Compressor

E

v

a

p

o

ra

to

r

Pump

Inlet

Outlet

Drain

Cooling

 

System

 

Sketch

C

o

n

d

e

n

s

e

r

F

lo

w

 

S

w

it

c

h

Summary of Contents for PH-LW15-BLP/17A

Page 1: ...ILLING PRODUCT SERIES Shenzhen Sunrise Industrial Co Ltd rd Add No 4 the 4th Tengfeng Road the 3 Industry Zone Fenghuang Fuyong Baoan District Shenzhen China P C 518103 Tel 86 755 3393 5303 Fax 86 755...

Page 2: ...LASER CHILLER OPERATORS MANUAL 20 Notes SUNRISE SUNRISE SUNRISE SUNRISE Notes...

Page 3: ...oop system 3 7 Start up 4 Operation 10 4 1 Temp Controller 4 2 Error codes and trouble shooting 5 Maintenance 14 5 1 Condenser vent hole filter screen 5 2 Water circuit 5 3 Water level 5 4 Periodic cl...

Page 4: ...user Your chiller is packed in special carton package please reserve the carton and other packing stuff before you can make sure chiller is running properly If the chiller doesn t work the chiller co...

Page 5: ...oling effects Automatically cooling and heating alternating the display accuracy can reach 0 1 and temperature stability is 0 3 0 5 3 Use famous brand electric fan which offersbig air volume low noise...

Page 6: ...Temp Controller panel Lock catch Front Top 4 5 6 7 8 4 Water outlet 5 Water inletl 6 Drain Back 7 Signal wire hole 8 Wheel 3 16 3 1 2 7 2 Cooling system Fan Drier Filter Cooling Solenoid Valve Capill...

Page 7: ...ir Discharge m3 h Inlet Outlet Drain compressor power HP 1PH 220V 50Hz or 60HZ 3 5 Inner Thread DN15 1 2 cooling capacity R134a Power supply refrigerant 820 36 7 Maintenance and technical support 7 1...

Page 8: ...diameter of the pipe is too small Please check whether the fluid viscosity is too high Please check the connection tube carefully 6 4 insufficient cooling or No cooling Please check whether the voltag...

Page 9: ...her the temp of the installation site is too high and ventilation condition is bad Slightly refrigerant leakage E3 error has been reported yet Whether the chiller has exceeded its designed lifetime re...

Page 10: ...ghtly connected and current frequency should be match with the requirements marked on the label which was pasted on the back of the chiller 3 4 Connection accessories Process pipeline There are 2 inne...

Page 11: ...lue 20 default value 0 1 default 1min System standby water tank temp xx setting temp xx Temp differential xx default value 20 default value 0 1 4 Press set button to enter function option chosen optio...

Page 12: ...width then wrap the connection for 3 4 circles tighten up the seal tape before installation screw the connection gently in order to avoid PVC connection break 2 Strain the seal tape and twist around t...

Reviews: