5. Installation Guide
5.1 Installation of Clamp Kit
5.1.1 The picture on the
right shows how to
install the MA Clamp.
You must ensure that
the thread of the
hexagon socket bolt
does not pass through
the bottom of the MA
Clamp. Position the MA
Clamp in the groove of
the rail and gently
screw the bolt 2 to 3
turns. At this point, the
bolt can still slide freely
in the rail, slide the bolt
to the position where
the Inter Clamp, End
Clamp or hook is finally
connected, screw the
bolt and lock.
(Recommended torque:
8 N·m).
SUNKING SOLAR TECHNOLOGY PHILIPPINE CORP
175 North Carpio St. Corner Rizal Avenue
Extension Caloocan City
5
(02)7728-21-24
(02)7907-51-24