Fig.1:
Insert short
decorative slot 1 (J1) into
(J2), then secure middle
beam connector (I) to (J1)
& (J2) by bolt (AA) and
washer (BB). Install long
decorative slot (K1) and
(K2) in the same way.
Fig.2:
Insert short
decorative slot 2 (J2) into
long decorative slot 1
(K1), secure Arch beam
connector 1 (H1) and
Post connector 1 (N1) to
(J1) & (K1) by bolt (AA)
and washer (BB).
Fig.3:
Attach post
connector 2 (N2) to
long decorative slot
(K1) & (K2) bolt (AA)
and washer (BB).
Fig.4:
Attach mosquito
netting pipe (L1) and (L2)
to decorative slot (J1) &
(J2) & (K1) & (K2) by
screw (CC) and washer
(BB).
Fig.5:
Insert
upper
screen connector (E)
and (F) into upper
screen corner connector
(D1) & (D2).
Fig.6:
Insert middle
beam (G2) & (G3) into
upper screen connector
(E) & (F).
Fig.7:
Insert middle
beam (G2) and (G3) into
middle beam connector
(I).
Fig.8:
Insert arch beam
(G1) into upper screen
corner connector (D1) &
(D2).