background image

 
CARE INSTRUCTIONS 

 

Clean gently with environmentally-friendly soap solution and water using a sponge. Do not use abrasive 
materials, wire brushes, chemicals, cleansers or bleach. Do not use a pressure washer. Rinse well. Allow to     
air dry.   
  
If there are nicks, chips and scratches, go to your local hardware store or home center and obtain a closest 
match touch-up paint suitable for outdoor metal use. Follow instructions that appear on the paint can. 

 

 

MADE IN CHINA 
 

Summary of Contents for L-PG050PST

Page 1: ...or tightness before and during usage WARNING Assemble as per instructions only Do not alter the construction of the pavilion Children and pets should be supervised when they are in area of the pavilion Notes before assembly Permanent installation recommended For ease of cleaning and safety do not assemble less than 6 ft 1 8 m from any obstruction such as a fence garage house overhanging branches l...

Page 2: ...x20 Bolt b 62 M8 Acorn Nut c 152 M8 Flat Washer d 4 M12 Nut e 4 M12 Flat Washer f 16 Φ8X260 Ground Stake g 32 M8x16 Bolt h 8 M8 Nut W1 2 M8 M12 Wrench W2 1 M10 Wrench Part Qty Part Des Diagram A 4 Bottom Pole B 4 Upper Pole C1 2 Side Rail 1 C2 2 Side Rail 2 D1 4 Top Rail 1 D2 4 Top Rail 2 E 8 Top Screen F1 1 Finial F2 1 Finial Ball G 2 Hanging Planter ...

Page 3: ...for the other 6 top rails Top Rail D1 and Top Rail D2 should alternate until circle is complete Screw Finial Ball F2 to Finial F1 Place Finial F1 in the center of the assembled circular rail and attach it to a Top Screen E with a Flat Washer c and an Nut h See Fig 2 At the same time the Top Screen E should be inserted into the assembled Top Rail D1 D2 with Flat Washer c and Acorn Nut b by another ...

Page 4: ...ts a See Fig 4 Repeat for remaining 3 Upper Poles B Fully tighten hardware Step 2 Assembly of Upper Poles to Bottom Poles 8 people are needed for this step Four people hold the 4 Bottom Poles A in vertical direction and the other 4 people lift the assembled Upper Poles B and the dome Attach Bottom Pole A to Upper Pole B with Bolts a and Flat Washer c See Fig 5 Repeat for remaining 3 Bottom Poles A...

Page 5: ...l D1 See Fig 8 Place Ground Stakes f through the base of the Bottom Pole A into the ground on soft surface See Fig 9 Fig 7 Fig 8 Fig 9 Step 1 Attach Side Rails to Poles Attach Side Rail C1 C2 to Bottom Pole A with Bolts a and Flat Washers c See Fig 7 Repeat for remaining 3 Bottom Poles A Fully tighten hardware ...

Page 6: ...rials wire brushes chemicals cleansers or bleach Do not use a pressure washer Rinse well Allow to air dry If there are nicks chips and scratches go to your local hardware store or home center and obtain a closest match touch up paint suitable for outdoor metal use Follow instructions that appear on the paint can MADE IN CHINA ...

Reviews: