Fig.5
:
Screw Hook (2B) into Top Connector for the second roof (2A) tight; Insert the other end of 2C into
2A; Insert one end of Long Bar for the second roof (2E) into 2A.
Fig.6
:
Tighten the other end of 2E with screen by using Screw CC, Washer BB and Nut DD.
Fig.7
: Tighten the other end of 2D with column by using Screw CC, Washer BB and Nut DD.
Warning
: Secure the
assembled frame on
the ground by using
Stake (GG), before
following steps which
require a ladder.
STEP #2
The second roof
(x 8)
(CC)
(x 8)
(BB)
(x 8)
(DD)
(x 1)
(WW)
(X12)
(GG)
Fig.4
:
Insert one end of
Medium Bar for the second
roof (2D) into one end of
Short Bar for the second
roof (2C).