![Sungrow SG110CX Quick Manual Download Page 6](http://html1.mh-extra.com/html/sungrow/sg110cx/sg110cx_quick-manual_1396674006.webp)
TD_202005_Logger1000_Quick Guide for SG30-50-110CX Inverters_V1.3
Page 6 of 16
© SUNGROW AUSTRALIA GROUP PTY LTD All rights reserved.
As we continuously improving our products, changes to this document may occur without notice.
Inverter connection to Logger1000
Connect the RS485 comms from the inverter(s) via A1/B1 and the energy meter via
A2/B2 to the Logger1000.
On the logger1000 side, A1 and B1 are terminals to connect with the inverter which
display as
com1
on the Logger1000 web portal; A2 and B2 are the terminals to
connect with the energy meter, they are shown as
com2
on the portal.
On the inverter SG30/50/110CX side, the RS485 cable should be plugged into the
terminal shown in the following figure which highlighted in red circle.