33
6
Commissioning
6.1
Inspection before Commissioning
Check the following items before starting the converter:
•
The converter is correctly installed and secure.
•
The converter DC switch and external circuit breaker are disconnected.
•
All cables and auxiliary parts are properly connected and fastened.
•
The cables are routed in a safe place or protected against mechanical damage.
•
All unused terminals at the bottom of the converter are properly sealed.
•
No external objects or parts are left on the top of the converter.
•
Warning signs & labels are suitably affixed and durable.
6.2
Commissioning Procedure
Step 1
Rotate all the DC switches of the converter to "ON" position.
Step 2
Connect the DC switch (if applicable) between the converter and the front and rear
equipment.
Step 3
If it is normal and the input conditions meet requirements, the converter will normally
operate.
Step 4
Observe the LED indicator to ensure that the converter operates normally. (Refer to
“L
LE
ED
D IIn
nd
diic
ca
atto
orr P
Pa
an
ne
ell”).
-- -- E
En
nd
d