http://www.sunflower
‐
solar.com/
Version
11.03
Subjec
tto c
hange 2011
SUNF
LOWER SOLAR
5
3.2
Unpack and inspection
Total quantity
SFA42*4715-HJ
SFA42*5818-HJ
No.
Name
15
18
20
24
30
15
18
20
24
30
1
Water
tank
1 1 1 1 1 1 1 1 1 1
2
Gantry
2 2 2 3 3 2 2 2 3 3
3
Decoration
ring
15+1 18+1
20+1
24+1
30+1
15+1
18+1
20+1 24+1 30+1
4
Silicon
ring
+1 +1 +1 +1 +1 +1 +1 +1 +1 +1
5
Tube
caps
15+1 18+1
20+1
24+1
30+1
15+1
18+1
20+1 24+1 30+1
6
Diagonal-leg
2 2 2 3 3 2 2 2 3 3
7
Stand
bar
2 2 2 3 3 2 2 2 3 3
8
Tube
holder
1 1 1 1 1 1 1 1 1 1
9 Long
diagonal
brace 2 2 2 3 3 2 2 2 3 3
10
Cross-bar
3 3 3 3 3 3 3 3 3 3
11 Front
Cross
brace 2 2 2 4 4 2 2 2 4 4
12 Back
Cross
brace 2 2 2 2 2 2 2 2 2 2
13 Screw
1 PKG
1 PKG
1 PKG
1 PKG
1 PKG
1 PKG
1 PKG
1 PKG
1 PKG
1 PKG
14
Vacuum
Tube
15 18 20 24 30 15 18 20 24 30
Note: In above form, the number after “+” means the quantity of extra free compensation parts.
3.3
Fix the Frames and Tank
3.3.1 Steps of Assembly
Steps 1: Gantry Assembly.
Fig 3.1
Gantry
Stand bar