
Mattress Pad Setup
1
Place the Mattress Pad on the bed with the label at the foot of the bed
facing outward. This puts the zones in the proper position to warm your
body ergonomically.
2
Place the base unit on the floor under the bed, and run the
Connector cable(s) along the floor to the foot of the bed.
(DO NOT sandwich the cable(s) between the mattress and
box spring. Avoid tangling or pinching.)
3
TWIN OR FULL SIZE:
Connect the Blue plug to the Blue
Connector until the plastic hinges click in place.
QUEEN OR KING SIZE:
Connect the Blue plug to the
Blue Connector, and connect the Green plug to the
Green Connector until the plastic hinges click in place.
CAUTION:
Cables must be COMPLETELY CONNECTED.
A risk of fire could result from a loose connection.
4
Plug the power cord into a 110–120 volt wall outlet.
STEP-BY-STEP SETUP
Your Sunbeam
®
Rest & Relieve
™
Therapeutic Mattress Pad Includes:
Mattress Pad
Zone Connector
Cables & Plugs
Base Unit
STEP-BY-STEP SETUP
Installing the Batteries
1
Remove the battery compartment
door from the back of the remote
control.
2
Insert three AAA batteries, matching
the + and – battery ends to the
symbols in the battery compartment.
3
Replace the battery compartment
door.
Remote Control
For questions or support, please visit:
www.sunbeam.com
4
3
For questions or support, please visit:
www.sunbeam.com
Important
CAUTION:
•
DO NOT
plug the power cord into the wall outlet until you have completely set up your Mattress
Pad per the instructions.
• Disconnect power cord from wall before detaching the base unit from the Mattress Pad.
•
DO NOT
attempt to force the plug. This appliance has a polarized plug (one blade is wider than
the other). To reduce the risk of electrical shock, this plug is intended to fit only one way into an
outlet. If the plug does not fit in the outlet, reverse the plug. If it still does not fit, contact a
qualified electrician.
Summary of Contents for Rest & Relieve FPO
Page 14: ......