Step 6. Preparing to Prime Machine
•
Fill Water Reservoir
-
Open the Lid and lift upwards using the
Handle inside.
-
Fill with cold water from the tap.
-
Insert the Water Reservoir into position
& close the Lid.
•
Power
-
Ensure that the Steam & Hot Water DIAL
is in the vertical position.
-
Insert the Power Plug into a 230-240V
AC power outlet & switch the power on.
-
Press the ON/OFF BUTTON to turn on
the machine.
-
The ON/OFF LIGHT will illuminate &
pulse to indicate the Thermoblock is
heating up.
-
The GRINDER LIGHT will be fully
illuminated from turn on.
- When the ON/OFF, EXTRACTION
BUTTONS & DIAL LIGHTS are all fully
illuminated, the machine is in the READY
state for EXTRACTION & DIAL features.
• Insert Group Handle
-
Insert the Two Cup Filter Basket in the
Group Handle.
-
Align the Group Handle with the
'INSERT' position located on the left of
the Group Head.
-
Insert the Group Handle flat against the
Group Head, then turn the Group Handle
right all the way to the centre position.
Step 7. Prime Espresso Machine
-
Press the TWO CUP BUTTON & water
should start flowing from the
Group Head.
-
Allow water to run through until it stops.
- The machine will return to the READY state.
-
Position Steam Wand over the Drip Tray.
-
Turn DIAL to HOT WATER.
-
Allow water to run through for 20 sec.
-
Return DIAL to vertical position.
- The machine will return to the READY state.
-
Now the Espresso Machine should be
thoroughly primed.
-
Wash Group Handle & Filter Basket in
warm water & dry before making your
first coffee.
-
If water is not flowing from the Group
Head or Steam Wand, repeat Step 7.
-
If water is still not running through,
contact Sunbeam Customer Care.
Details are on the back page.
MAX
2.8 L
1 L
MIN
MAX
2.8 L
1 L
MIN
9
Before First Use of the Barista Max
Important:
This priming step must be
completed prior to first use.
Note:
Make sure that the Water Reservoir
is clean & free of any debris, as any fine
particles can block the water flow.
Note:
Turning the Group Handle to the
centre position might be tight for the
first few uses.
MANUAL SHOT
GRINDER
ON / OFF
READY
THERMOBLOCK
58MM CAFÉ GROUP HEAD
CENTRE
S
INSERT
INSERT
2.TURN
1. ALIGN
& INSERT
Note:
For the first few seconds the Pump
will make a louder than usual noise as it
begins pumping the water through.