Sunbank Installation Manual
2.
Not Included Parts
The specific hardware necessary is installation and climate specific. This list is illustrative, not
comprehensive.
Contact us for a Shopping Cart link to help speed up your purchase of these items.
The Sunbank can be installed as a pre-heater with a bypass or as a standalone system. The
following parts list is for the basic pre-heater setup:
1
–
copper or PEX pipe (length and diameter dependent upon installation)
1
–
roll of Teflon plumbing tape
1
–
bottle of thread sealant
1-
4.5 gallon potable water expansion tank
2
–
¾”
FNPT adapters to interface with tank inlet and outlet
2
–
¾”
FNPT caps (if not using side ports
–
most installations)
1
–
½” brass plug
(if not using thermowell)
2
–
¾” MNPT
drain valves
6
–
T’s (diameter depend
s on pipe size chosen)
6
–
Ball valves (see plumbing configuration diagram in Part 4 for explanation)
1
–
Flashing to interface with the roof/building penetration point
1
–
lead free mixing valve (also known as a tempering valve)
Roof attachments (type depends on roof surface
–
contact us for suggestions)
Installation specific plumbing fittings to interface with existing plumbing
Pipe insulation and aluminum jacketing for outdoor pipe
Optional:
1
–
freeze protection valve More info: https://thesunbank.com/freeze-protection/