Mounting the Left Side of the Slide Rail
▼
Verify Correct Operation of the Slide
Rails and the CMA
Perform this procedure both before and after you install the server cables in the
CMA. Perfoming the procedure before the CMA contains cables helps ensure that it
extends and contracts smoothly before the cables are added.