
Chapter 4
Section 4.2
Using the VSAM eWay Database Wizard
Creating a New VSAM OTD
VSAM eWay Adapter User’s Guide
45
Sun Microsystems, Inc.
Figure 17
Naming an OTD
2
Click
Next
.
4.2.7
Review Selections
Review the selections made for the new OTD.
Steps Required to Review Your OTD Selections:
1
View the summary of the OTD. If you find you have made a mistake, click
Back
and
correct the information.
2
If you are satisfied with the OTD information, click
Finish
to begin generating the
OTD. See Figure 18.
The resulting
OTD
appears on the Enterprise Designer’s Project Explorer.