22
Sun Fire V490 Server Setup and Rackmounting Guide • August 2004
Checklist of 2-Post Rackmounting and
Setup Tasks
Note –
The steps are different if you are installing the server into a populated rack.
See
“Install the Server Into a Populated Rack” on page 29
for instructions.
TABLE 2-1
Overview of 2-Post Rackmounting and Setup Tasks
Step
Task
Refer to:
1
Unpack the rackmounting kit and
verify the contents.
“Inventory for 2-Post Rackmounting” on
page 23
2
Attach the brackets to the server.
“Attach the Mounting Brackets to the
Chassis” on page 24
3
Locate the mounting holes.
“Locate the Mounting Holes” on page 25
4
Install the mounting screws.
“Install the Mounting Screws” on page 26
5
Install the server into the rack.
“Install the Server Into the Rack” on page 27
6
Install the cable management arm.
“Install the Cable Management Arm” on
page 33
7
Connect the power cords.
“Connect the Power Cords” on page 41
8
Connect a twisted-pair Ethernet
(TPE) cable
Summary of Contents for Sun Fire V490
Page 6: ...vi Sun Fire V490 Server Setup and Rackmounting Guide August 2004...
Page 10: ...x Sun Fire V490 Server Setup and Rackmounting Guide August 2004...
Page 30: ...20 Sun Fire V490 Server Setup and Rackmounting Guide August 2004...
Page 38: ...28 Sun Fire V490 Server Setup and Rackmounting Guide August 2004...
Page 59: ...Chapter 3 Setup Procedures 49 Allow slack Velcro straps...