18
SPARCstation 20 Service Manual • July 1996
provides a typical POST progress message that is displayed
through serial port A.
The uniprocessor POST tests one MBus module. The multiprocessor POST tests all
installed MBus modules. POST detects only major failures. In a fully configured
system with two or more processors, POST may take several minutes to be
completed.
To view POST progress and error messages, connect a terminal to serial port A or
use a
tip
connection to another Workstation. See “Setting Up a tip Connection.”
If a terminal is not connected to serial port A, or a
tip
connection is not
implemented, the screen will be blank during the POST diagnostic test mode. In this
case, the keyboard LEDs are used to determine error conditions. See “Status LEDs
and Indicators.”
CODE EXAMPLE 3-1
Typical POST Progress Message
SMCC SPARCstation 10/20 UP/MP POST version xxx (xx/xx/xxxx)
CPU_#0 TI, TMS390Z55(3.x) 1Mb External cache
CPU_#2 TI, TMS390Z55(3.x) 1Mb External cache
CPU_#1 ******* NOT installed *******
CPU_#3 ******* NOT installed *******
<<< CPU_00000000 on MBus Slot_00000000 >>> IS RUNNING (MID =
00000008)
MMU Context Table Reg Test
MMU Context Register Test
.
.
.
.
.
Summary of Contents for SPARCstation 20
Page 10: ...x SPARCstation 20 Service Manual July 1996...
Page 50: ...26 SPARCstation 20 Service Manual July 1996...
Page 62: ...38 SPARCstation 20 Service Manual July 1996...
Page 68: ...44 SPARCstation 20 Service Manual July 1996...
Page 78: ...54 SPARCstation 20 Service Manual July 1996...
Page 138: ...114 SPARCstation 20 Service Manual July 1996...
Page 139: ...Chapter 8 Removing and Installing Subassemblies 115...
Page 140: ...116 SPARCstation 20 Service Manual July 1996...
Page 146: ...122 SPARCstation 20 Service Manual July 1996 FIGURE 9 4 Installing a Hard Disk Drive...
Page 162: ...138 SPARCstation 20 Service Manual July 1996...
Page 242: ...218 SPARCstation 20 Service Manual July 1996...
Page 266: ...242 SPARCstation 20 Service Manual July 1996 wrist strap attaching 50...