Chapter 2
Installing the Adapter
19
3. Press the Attention button.
The power LED should blink about 10 times then remain a steady green light.
▼
To Verify the ExpressModule Installation
1. Use the
cfgadm
command to verify the ExpressModule installation:
If the ExpressModule is properly installed and connected, you should see output
similar to the following:
2. Use the
dladm show-dev
command to verify that the link is up.
You should see output similar to the following:
#
cfgadm
Ap_Id
Type
Receptacle
Occupant
Condition
pcie5 etherne/hp connected configured ok
#
dladm show-dev
e1000g2
link: up
speed: 1000
Mbps
duplex: full
e1000g3
link: up
speed: 1000
Mbps
duplex: full