8
These hints are only supplimentary to the regulations of DIN 15018 and the regulations for the prevention of
accidents from the authorities VBG 8, VGB 9a.
Furthermore any local regulations are to be observed!
3
Installation of the lifting device support
1
≥ 140
≥ 140
400 [15.7"
]
[≥ 5.5"]
[≥ 5.5"]
190
[7.5"]
320 [12.6"
]
Ø17
[0.67"]
≥ 140
≥ 140 [≥ 5.5"]
400 [15.7"]
[≥ 5.5"]
275
[10.8"]
275
[10.8"]
Ø17
[0.67"]
2
3
A
B
0503-0004
Legend
1 Hexagon nut DIN 985
2 Hexagon nut ISO 4032
3 e.g. Anchor rods
A
Lifting device support, shape A
(pedestal mount base)
B
Lifting device support, shape B (wall
mount base)
Figure 3 Options lifting device support
•
First check all parts whether they are correct and all available according to the parts list.
•
Inspection of the installation site according to the drawings:
a. Check the installation site regarding stability (min. B25).
b. Check the installation place regarding suitability for the safe operation of the lifting unit.
c. To allow the precise alignment of the pedestal base (shape B) and a correct transfer of the load to the
building, nuts (3/2) have to be placed below the base plate.
•
Take care of correct conditions for anchoring, e.g:
- Depth of holes
- Drill diameter
-
Edge spacings
- Working temperature
-
Expiration date of plastic mortar
- Curing time
- Fastening torque of nuts
- Nut lockings
•
Before first operation of the lifting unit the support installation has to be inspected by an expert. A written