TABLE OF CONTENTS
Section 4
INSTALLATION
31
4.1 MOUNTING OF COMPRESSOR
31
4.2 VENTILATION AND COOLING
31
4.3 SERVICE AIR PIPING
31
4.4 COUPLING ALIGNMENT CHECK
31
4.5 FLUID LEVEL CHECK
32
4.6 ELECTRICAL PREPARATION
32
4.7 MOTOR ROTATION DIRECTION CHECK
Section 5
OPERATION
33
5.1 GENERAL
33
5.2 PURPOSE OF CONTROLS
34
5.3 PARAMETERS SETUP
35
5.4 OPERATING THE COMPRESSOR
36
5.5 SUPERVISOR II OUTPUT RELAYS
37
5.6 INITIAL START-UP PROCEDURE
37
5.7 SUBSEQUENT START-UP PROCEDURE
37
5.8 SHUTDOWN PROCEDURE
Section 6
MAINTENANCE
39
6.1 MAINTENANCE INTRODUCTION
39
6.2 DAILY OPERATION
39
6.3 MAINTENANCE AFTER INITIAL 50 HOURS OF
OPERATION
39
6.4 MAINTENANCE AS REQUIRED BY LUBRICATION
GUIDE (SECTION 3)
39
6.5 FLUID CHANGE
39
6.6 SEPARATOR MAINTENANCE
39
6.7 PARTS REPLACEMENT AND ADJUSTMENT PROCEDURES
39
FLUID FILTER MAINTENANCE
40
AIR FILTER MAINTENANCE
41
AIR/OIL SEPARATOR ELEMENTS REPLACEMENT
42
OIL RETURN/SIGHT GLASS MAINTENANCE
42
DIFFERENTIAL PRESSURE REGULATOR ADJUSTMENT
42
DRIVE COUPLING INSTALLATION AND ALIGNMENT
Section 7
TROUBLESHOOTING
45
7.1 TROUBLESHOOTING
45
7.2 TROUBLESHOOTING GUIDE
Summary of Contents for LS16T
Page 6: ......
Page 23: ...Section 2 DESCRIPTION 17 Figure 2 4A Control System Diagram Functional Components...
Page 24: ...Section 2 DESCRIPTION 18 Figure 2 4B Control System Diagram START...
Page 25: ...Section 2 DESCRIPTION 19 Figure 2 4C Control System Diagram MODULATION...
Page 26: ...Section 2 DESCRIPTION 20 Figure 2 4D Control System Diagram FULL LOAD...
Page 27: ...Section 2 DESCRIPTION 21 Figure 2 4E Control System Diagram UNLOAD...
Page 32: ...NOTES 26...
Page 35: ...Section 3 SPECIFICATIONS 29 Figure 3 2 Identification LS16T 100 125 Air cooled 02250138 172R01...
Page 36: ...Section 3 SPECIFICATIONS 30 Figure 3 3 Identification LS16T 150 200 Air cooled 02250134 200R02...
Page 44: ...NOTES 38...
Page 54: ...NOTES 48...
Page 57: ...NOTES 51...
Page 62: ...Section 8 ILLUSTRATIONS AND PARTS LIST 56 02250134 187R00 8 5 AIR INLET SYSTEM...
Page 72: ...Section 8 ILLUSTRATIONS AND PARTS LIST 66 02250134 191R00 8 9 AIR PIPING SYTEM 150 200HP...
Page 74: ...Section 8 ILLUSTRATIONS AND PARTS LIST 68 02250134 191R00 8 9 AIR PIPING SYTEM 150 200HP...
Page 76: ...Section 8 ILLUSTRATIONS AND PARTS LIST 70 02250138 175R01 8 10 FLUID PIPING SYSTEM 100 125HP...
Page 80: ...Section 8 ILLUSTRATIONS AND PARTS LIST 74 02250134 197R00 8 12 DISCHARGE SYSTEM...
Page 82: ...Section 8 ILLUSTRATIONS AND PARTS LIST 76 02250134 197R00 8 12 DISCHARGE SYSTEM...
Page 84: ...Section 8 ILLUSTRATIONS AND PARTS LIST 78 02250134 197R00 8 12 DISCHARGE SYSTEM...
Page 86: ...Section 8 ILLUSTRATIONS AND PARTS LIST 80 02250134 196R00 8 13 CONTROL START SYSTEM...
Page 88: ...Section 8 ILLUSTRATIONS AND PARTS LIST 82 02250134 196R00 8 13 CONTROL START SYSTEM...
Page 90: ...Section 8 ILLUSTRATIONS AND PARTS LIST 84 02250137 724R02 8 14 CONTROL PANEL...
Page 92: ...Section 8 ILLUSTRATIONS AND PARTS LIST 86 02250138 176R00 8 15 ENCLOSURE 100 125HP...
Page 94: ...Section 8 ILLUSTRATIONS AND PARTS LIST 88 02250134 193R00 8 16 ENCLOSURE 150 200HP...
Page 96: ...Section 8 ILLUSTRATIONS AND PARTS LIST 90 8 17 DECAL GROUP...
Page 98: ...Section 8 ILLUSTRATIONS AND PARTS LIST 92 8 17 DECAL GROUP...
Page 100: ...Section 8 ILLUSTRATIONS AND PARTS LIST 94 8 17 DECAL GROUP...
Page 102: ...Section 8 ILLUSTRATIONS AND PARTS LIST 96 8 18 DECAL LOCATIONS OPEN AIR COOLED...
Page 104: ...Section 8 ILLUSTRATIONS AND PARTS LIST 98 8 19 ENCLOSURE DECALS...
Page 106: ...Section 8 ILLUSTRATIONS AND PARTS LIST 100 8 20 DECAL LOCATIONS CONTROL BOX...
Page 110: ...NOTES 104...
Page 111: ......