Installation
16
Unit location:
Installation must be in a
dry, frost- and draught-protected
room and at an accessible height.
Insulation of complete pipe system is indispensible,
-> minimum thickness 30 mm, heat conductivity
.
Water line has to be insulated against condensation of water and heat loss.
Water connection:
Water supply line 1”, water outlet line 1”, circuit piping: min. ¾”, max. 1”,
Water pressure has to be between min. 1 bar (14 psi) - max. 4 bar (58 psi)!
If water pressure is lower than recommended, install a pressure intensifier.
If water pressure is higher than recommended, install a pressure reducer valve.
Circuit length
Length of the insulated water tube system incl. all return pipes should
not exceed 250 m (820 feet)
Circulation pump
Circulation pump must run on
positon 3
.
Circulation pump has to be bled (see page 23).
The height difference between entry and return pipeline
should not exceed 7 meters.
Functioning capability of circulation pump has to be constantly checked!
Application field:
SUEVIA Heating Unit Mod. 311
is exclusively designed to keep water pipes frost-free in stables
for animals.
It can only be used for warming up water, other liquids are not allowed!
Pipe insulation:
IMPORTANT!
W
0,04 /
mK
:
:
The Heating Unit must be mounted in a horiz
( 2) Mount circulation pump on heating unit.
-> Connect the pump's cable with the pump. .
( 3)
(18) Install
( 7)
( 6) Install
Pay attention to the water flow direction.
(16)
(15)
(11) Install
(12)
(17)
Install it only horizontally.
Pay attention to the water flow direction.
( 4) Fix the adjustable return flow thermostat on metal pipeline.
( 8) Fix firmly thermostat on metal pipe.
-> Attention: when installing it you have to take care that the sensors rest against the pipe <-
(19)
W
(13)
0,04 /
mK
(14)
(10) I
Heating Unit must be used with two
ontal position on the wall!
Water circuit (min. ¾", max. 1”) has to be installed according to the following sequence
(see the scheme):
Install non-return valve
water filter
Install automatic vent valve:
must be at highest point of circuit in a
frost-protected-room
(black knurled screw has to be in open position!)
safety valve.
Install SUEVIA Drinking Bowls into the circuit connected at the top and the bottom
Install drain cock
shut-off valve (for the main and the bypass-management)
Install manual ventilation valve
Install Flow control Ref. 101.0309
( 5)
Mount non-return flap.
Mount heating cable in frost-protected areas or in non-draughty locations.
Insulate pipes
minimum thickness 30 mm, heat conductivity
Mount bite protection
nstall residual current divices.
residual current devices - 30 mA (RCD)