CyberOne EC CW IOM Manual
6
USER
INTERFACE
TERMINAL
DISCONNE
CT SWITCH
HINGE
D
DOOR
36
IN
2.0
INSTALLATION
2.1
Receiving the Equipment
Your CyberOne EC CW precision A/C system has been
tested and inspected prior to shipment. To ensure your
equipment is received in excellent condition, visually inspect
the equipment immediately upon delivery. Carefully remove
the shipping container and all protective packaging. Remove
the access panels and thoroughly inspect the unit interior
for any signs of transit-incurred damage. If there is shipping
damage, it must be noted on the freight carrier’s delivery
forms before signing for the equipment. Any freight claims
must be done through the freight carrier; STULZ can assist in
the claim filing process with the freight carrier. STULZ ships
all equipment FOB. Should any damage be present, notify
STULZ Product Support prior to attempting any repairs.
Refer to “5.0 Product Support” on page 19 of this manual
for instructions.
A unit data package was sent with your unit. It contains this
manual, a supplemental microprocessor controller manual,
system drawings, applicable SDS’s, warranty registration,
other component manuals and applicable instructions
based on the configuration and options of your unit. The
data package has been placed in your unit in a clear plastic
bag. These documents need to be retained for future
reference.
NOTE
Items that have been shipped loose, such as
controller terminal, temperature/humidity sensors,
water detectors, etc., are shipped inside the air
conditioner unless specified otherwise by the
customer. A plenum box (if applicable) is shipped
separately. Unpack and store these items in a safe
place unless you are using them immediately.
2.2
Moving the Equipment
CyberOne EC CW systems are designed to be kept in a
vertical position. The unit is shipped on a skid to facilitate
moving prior to installation. Move the unit with a suitable
device such as a forklift, pallet jack or roller bar and dollies
capable of handling the weight of the unit. The unit should
always be stored indoors in a dry location prior to installation.
CAUTION
When moving the unit it must be lifted vertically and
kept in a level position to prevent damage.
2.3
Site Preparation
CyberOne EC CW systems are designed with easy service
access in mind. A hinged access door is provided on the
front of the unit and removable access panels are located
on each side. In order to have full service access to internal
components, no permanent obstructions should be placed in
front of the unit. See Figure 3 for the minimum recommended
front installation clearance.
NOTE
Working clearance requirements need to be
established prior to mounting the unit. Refer to
local and national electrical codes.
Figure 3.
Recommended Installation Clearance
When determining the installation location consider how you
will route the piping and wiring into the cabinet and ensure
access is available (see “2.7 Piping Connections” on page
11). Pilot holes for piping and wiring are located on the
CyberOne EC CW unit based on the configuration. On an
upflow configuration, the pilot holes are located in the top of
the cabinet. On a downflow configuration, they are located in
the floor of the cabinet. See the installation drawing provided
with your unit for pilot hole locations.