![Stübbe ETLB-S series Original Operating Manual Download Page 2](http://html1.mh-extra.com/html/stubbe-0/etlb-s-series/etlb-s-series_original-operating-manual_1386410002.webp)
Table of contents
Table of contents
1
About this document
.. . .. . .. . . . . . . . . . . .. . .. . . .. . . .. 4
1.1
Target groups . .. . .. . .. . .. . .. . .. . . . . . .. . .. . .. .. 4
1.2
Other applicable documents
. . . . . . . . . . . . . . .. 4
1.3
Warnings and symbols .. . .. . . . . . .. . .. . .. . . . .. 5
2
Safety
. ... .. ... ... . .. . . . . . . . . . . . . . .. . .. . . . . . . . . . . . . .. .. 6
2.1
Intended use .. . .. . .. . .. . . . . . . . . . . .. . . .. . .. . . .. 6
2.2
General safety instructions
. .. . . . . . . . . . . . . . .. 6
2.2.1 Product safety
. . . . . . . .. . . . . . . . . .. . .. . .. . . . .. .. 6
2.2.2 Obligations of the operating company
. . . . .. 7
2.2.3 Obligations of personnel . . . .. . .. . .. . . . . . . . . .. 7
2.3
Speci
¿
c hazards . . . . . . . . . .. . .. . .. . . . . . . . . . .. .. 7
2.3.1 Hazardous pumped liquids
.. . . . . . . . . . . . . . . .. 7
3
Layout and function
. .. . . . . .. . . . . . . . . .. . .. . .. . .. .. .. 8
3.1
Marking
. . . .. . . . . . . . . . . . . . .. . .. . . . . . . . . . . . . .. .. 8
3.1.1 Name plate
. . . . .. . .. . .. . . . . . . . . . . .. . .. . . .. . . .. 8
3.2
Description .. . . . . . . . . . . . . . .. . .. . . . . . . . . . . . . . . .. 8
3.3
Assembly
. .. .. . . . . . . .. . . . .. . . .. . . . . . . . . . . . . . .. 8
4
Transport, storage and disposal
.. . . . . . . . . . . . . . . .. 9
4.1
Transport . ... .. . .. . . . . .. . . . . . . . . . . . .. . .. . .. . . .. 9
4.1.1 Unpacking and inspection on delivery
. . . . .. 9
4.1.2 Lifting
. ... . .. .. . . . .. . .. . . . . .. . .. . . . . . . . . . . . .. .. 9
4.2
Storage
.. ... .. . .. . . . . .. . . . . . . . . . . . .. . .. . .. . . .. 10
4.3
Disposal .. . .. .. . .. . .. . .. . . . . . . . . . . .. . . .. . .. .. .. 10
5
Setup and connection
. .. . .. . .. . .. . .. . . . . . .. . .. . .. .. 11
5.1
Preparing for installation
. . .. . . . . . . . . . . . . . . .. 11
5.1.1 Checking the operating conditions for the
ETLB-S
. . .. . .. .. . .. . . .. .. . .. . . . . . . . . .. . .. . .. .. 11
5.1.2 Checking the operating conditions for the
ETLB-ST . .. . . . .. . .. . . .. .. . .. . . . . . . . . .. . .. . .. .. 11
5.1.3 Preparing the installation site
. . . . . .. . .. . .. .. 12
5.1.4 Surface preparation . .. . . . . . . . . . . .. . . .. . .. . . .. 12
5.2
Setting up .. . .. .. . .. . . .. .. . .. . . . . . . . . .. . .. . .. .. 12
5.3
Planning pipelines . . . . . . . .. . .. . .. . . . . . . . . . . . .. 12
5.3.1 Specifying supports and
À
ange
connections . .. . . . . . . . .. . . . . . . . . .. . .. . .. . . . .. .. 12
5.3.2 Specifying nominal widths
. .. . . . . . . . . . . . . . . .. 12
5.3.3 Optimizing changes of cross section and
direction .. . .. . . . . . . . . . . . . . .. . .. . . . . . . . . . . . . .. .. 12
5.3.4 Providing safety and control devices
(recommended)
. . . . . . . . . . . . .. . .. . .. . . . . . . . . .. 12
5.4
Fitting the accessory part . . .. . .. . .. . . . . . . . . .. 13
5.4.1 Preparing the accessory part . .. . . . . . . . . . . . .. 13
5.4.2 Checking the operating conditions for the
accessory part . . . . . . .. . . . .. . . .. . . . . . . . . . . . . . .. 13
5.4.3 Fitting the accessory part . . .. . .. . .. . . . . . . . . .. 13
5.5
Connecting the pipes
. . . . .. . .. . . . . . . . . . . . .. .. 14
5.5.1 Keeping the piping clean
. . . .. . . . . . . . . . . . .. .. 14
5.5.2 Installing the pressure pipe . .. . . . . . .. . .. . .. .. 14
5.5.3 Inspection for stress-free pipe
connections . .. . . . . . . . .. . . . . . . . . .. . .. . .. . . . .. .. 14
5.6
Electrical connection .. .. .. . . .. .. .. . . .. .. . . . . . 15
5.6.1 Connecting the motor . . . . .. .. . . . . .. . . . .. . . . . . 15
5.6.2 Connecting the thermistor
. .. . . . . .. .. . . . . . . . . 15
5.6.3 Check direction of rotation . . .. .. .. . . .. .. . . . . . 15
5.7
Performing the hydrostatic test . . .. .. . . .. . . . . 15
6
Operation
. .. . . .. .. . . . . .. .. . . .. .. .. . . .. .. .. . . .. .. . . . . . 16
6.1
Preparing for commissioning . .. .. . . .. .. . . . . . 16
6.1.1 Check downtimes
.. .. . . . . .. .. . . . . .. .. . . .. . . . . 16
6.1.2 Filling and bleeding
.. . . . . .. .. . . . . .. .. . . .. . . . . 16
6.2
Commissioning . . . .. .. . . . . .. .. . . . . .. .. . . .. . . . . 16
6.2.1 Switching on . . . .. . . . .. . . . . .. .. . . . . .. .. . . . . . . . . 16
6.2.2 Switching off
. . . .. . . . .. . . . . .. .. . . . . .. .. . . . . . . . . 17
6.3
Shutting down the pump .. . . .. .. .. . . .. .. . . . . . 17
6.4
Restoring the pump to service
. .. . . .. .. . . . . . 18
6.5
Operating the stand-by pump
. . . .. .. . . . . . . . . 18
7
Maintenance
. . .. .. . . . . .. .. . . .. .. .. . . .. .. .. . . .. .. . . . . . 19
7.1
Inspections
. .. .. . . .. .. . . . . .. .. . . . . .. .. . . .. . . . . 19
7.2
Servicing . .. . . . . .. .. . . .. .. .. . . .. .. .. . . .. .. . . . . . 19
7.2.1 Maintenance in accordance with maintenance
schedule
. . .. .. .. . . .. .. . . . . .. .. . . . . .. .. . . . . . . . . 19
7.2.2 Cleaning the pump . . .. .. .. . . .. .. . . . .. . . . . . . . . 19
7.3
Dismounting
.. .. . . .. .. . . . . .. .. . . . . .. .. . . .. . . . . 20
7.3.1 Preparations for dismounting . . . . .. .. . . .. . . . . 20
7.3.2 Disassembly of spiral casing
. . . . .. .. . . .. . . . . 21
7.4
Replacement parts and return
. .. . . .. .. . . . . . 21
7.5
Installing
. . .. .. .. . . .. .. . . . . .. .. . . . .. . . .. .. . . . . . 22
8
Troubleshooting
.. .. .. . . .. .. . . . . .. .. . . . . .. .. . . . . . . . . 23
9
Appendix
. . . .. .. . . .. .. .. . . .. .. . . . . .. .. . . . . .. .. . . . . . . . . 25
9.1
Replacement parts . .. . . . . .. .. . . . . .. .. . . .. . . . . 25
9.1.1 Part numbers and designations
. .. .. . . .. . . . . 25
9.1.2 Sectional drawings . . .. .. .. . . .. .. .. . . .. .. . . . . . 26
9.2
Technical speci
¿
cations . . .. .. . . . . .. .. . . . . . . . . 31
9.2.1 Ambient conditions . . .. .. .. . . .. .. .. . . .. . . . . . . . 31
9.2.2 Sole plate tightening torques . . . . . . . . . . .. .. .. 31
9.2.3 Tightening torques of casing screws . .. . . . . . 31
9.2.4 Filling heights and installation
dimensions
. . . . .. .. . . .. .. .. . . .. .. .. . . .. .. . . . . . 31
9.2.5 Flange tightening torques
. . .. .. .. . . .. .. . . . . . 31
9.2.6 Permissible forces at the pressure
socket
. . .. .. . . . . .. .. . . .. .. . . . .. . . . . .. .. . . .. . . . . 31
9.2.7 Sound pressure level
. .. .. . . .. .. .. . . .. .. . . . . . 32
9.3
Maintenance schedule . . . .. .. . . . . .. .. . . .. . . . . 32
9.4
Declaration of conformity in accordance with
EC machinery directive
. .. . . .. .. .. . . .. .. . . . . . 33
2
ETLB-S, ETLB-ST
BA-2018.01.25 EN
301 356