![Stübbe ETLB-S series Original Operating Manual Download Page 13](http://html1.mh-extra.com/html/stubbe-0/etlb-s-series/etlb-s-series_original-operating-manual_1386410013.webp)
Setup and connection
5.4
Fitting the accessory part
5.4.1
Preparing the accessory part
1. Unpack the accessory part when received and inspect it for
transportation damage.
2. Report any transportation damage to the manufacturer
immediately.
3. For immediate installation, damage packaging material
according to local regulations. If installation is not to be
performed until a later time, leave the accessory part in its
original packaging.
5.4.2
Checking the operating conditions for
the accessory part
1. Ensure the necessary installation dimensions and
¿
lling
level of the pump with the accessory part installed (
ĺ
data
sheet):
–
Minimum distances
–
Maximum
¿
lling height
–
Minimum
¿
lling height
2. Ensure that the substrate or container can take the weight
of the pump bearing the accessory part.
5.4.3
Fitting the accessory part
1
2
3
4
5
6
7
8
Fig. 6
Installation of accessory parts
1
Discharge elbow /
À
ange adapter
2
Union nut
3
Union nut
4
Discharge
À
ange
5
Volute casing
6
Adapter
7
Suction strainer
8
Suction extension
301 356
BA-2018.01.25 EN
ETLB-S, ETLB-ST
13