- 11 -
3)
Your charger will have been supplied with either a green energy lever valve
and check valve to suit the main water supply size of (22, 28 or 35 mm).
Having ensured the stopcock is turned off and (if installing on an existing
Mainsboost system) drained it, remove a section of pipe to allow fitting
of 2 tee pieces (not supplied), the lever valve and check valve (Fig. 6).
4)
The Charger unit has been designed to allow pipework connections to be
made in the most convenient way, select the best route.
5)
Care should be taken not to kink the hoses or bend them through an angle
greater than 30 degrees.
6)
Route 15 mm feed and return from the tees inserted in the main, passing
through the isolating valves supplied (Fig. 6).
7)
Ensure grommets are fitted correctly in all case apertures to ensure the
pipework
does not
vibrate against the case (Fig. 6).
8)
Install the supplied ULK kit as per the instructions supplied with it and in the
location shown in figure 6.
Fig. 6
Supplied with MBC 12
Isolating
valve
Stopcock
Check valve
Mains supply
Bypass kit
Isolating
valves
Direction
of flow
ULK kit
(supplied
with vessel)