3) 

Your charger will have been supplied with either a green energy lever valve    

 

and check valve to suit the main water supply size of (22, 28 or 35 mm). 

 

 

Having ensured the stopcock is turned off and (if installing on an existing  

 

 

Mainsboost system) drained it, remove a section of pipe to allow fitting  

 

 

of 2 tee pieces (not supplied), the lever valve and check valve (Fig. 6).

4) 

The Charger unit has been designed to allow pipework connections to be    

 

made in the most convenient way, select the best route.

5) 

Care should be taken not to kink the hoses or bend them through an angle    

 

greater than 30 degrees.

6) 

Route 15 mm feed and return from the tees inserted in the main, passing  

 

 

through the isolating valves supplied (Fig. 6).

7) 

Ensure grommets are fitted correctly in all case apertures to ensure the  

 

 pipework 

does not

 vibrate against the case (Fig. 6).

8) 

Install the supplied ULK kit as per the instructions supplied with it and in the    

 

location shown in figure 6.

Fig. 6

Supplied with MBC 12

Isolating 

valve

Stopcock

Check valve

Mains supply

Bypass kit

Isolating 

valves

Direction 

of flow

ULK kit

(supplied 

with vessel)

Summary of Contents for Mainsboost Charger MBC 12

Page 1: ...t Charger units Mainsboost Charger Pump MBC 12 Bypass Kit Wall Mounted Mainsboost Charger Installation Operation Maintenance Instructions Please leave this instruction booklet with the home owner as i...

Page 2: ...tent and reliable water services Installation parameters must not exceed the values given in the technical specifications STORAGE If this product is not to be installed immediately on receipt ensure t...

Page 3: ...ren without supervision z Maximum head closed valve 43 metres z The motor casing can become very hot under normal operating conditions Care must be taken to ensure it cannot be touched during operatio...

Page 4: ...g and securing details are carefully noted to ensure re assembly to the same factory pattern is always maintained z If the supply cord is to be changed or is damaged it must be replaced with a special...

Page 5: ...ackage 2 1 Ball valve 1 2 Single check valve 1 Your product may vary slightly from the picture above IMPORTANT Your Mainsboost Charger MBC 12 system will be delivered in two boxes Please check the con...

Page 6: ...he mains is supplemented by the water from the Mainsboost unit to provide a balanced supply at consistent pressure to downstream services On occasions where the static pressure is less than 2 bar a ch...

Page 7: ...re pipework Ensure pipework to and from the Mainsboost Charger MBC 12 is independently supported clipped to prevent forces being transferred to inlet and outlet branches of pump Flexible hoses supplie...

Page 8: ...pump in a location where in the unlikely event of a water leak any spillage is contained or routed to avoid electrics or areas sensitive to water damage 3 16 Static inlet pressure Ensure the static i...

Page 9: ...and the Mainsboost vessel 4 12 System Designation It is important to understand what upstream and downstream refers to before starting the installation Upstream The term Upstream refers to the system...

Page 10: ...unit Fig 4 1 Fit mounting plate onto wall ensuring level Fig 5 2 Hook pump assembly onto mounting plate and secure in place using M6 set screw Fig 5 Fig 5 Fig 4 Mounting plate Pump assembly M6 set scr...

Page 11: ...he most convenient way select the best route 5 Care should be taken not to kink the hoses or bend them through an angle greater than 30 degrees 6 Route 15 mm feed and return from the tees inserted in...

Page 12: ...anently connected to the fixed wiring of the mains supply using the factory fitted supply cord via a dedicated double pole switched fused spur off the ring main 6 17 Wiring of connection unit WARNING...

Page 13: ...to the same factory pattern is always maintained 6 21 If the supply cord is to be changed or damaged it must be replaced by a special cord available from Stuart Turner or one of its approved repairers...

Page 14: ...d leave outlet taps open 7 13 Check the chart below for the correct pump pressure setting against the static mains pressure recorded Warning NOTE PRV setting must not exceed 5 0 bar Refer to the Mains...

Page 15: ...the up down arrows to change the selected parameter s to the desired value z After changing the required parameter s press the set button twice in quick succession to lock the new value into the contr...

Page 16: ...ist filling of the system z Close Mainsboost vessel isolation valve z Allow the pump to continue running until air has been completely purged from the system all outlets will have to be opened and clo...

Page 17: ...xible hoses Connections 15 mm push in x G female x 235 mm long 15 mm push in x G female x 200 mm long Motor Type Induction thermal trip auto reset Duty rating Continuous S1 Electrical Power supply Vac...

Page 18: ...9 12 Alarm fault codes All alarms automatically reset except Prt and PF1 Displayed message Fault description Action A Hnt high temp cut out Pump head overheating head temperature has exceeded the set...

Page 19: ...overed by this warranty Damage arising from incorrect installation improper use unauthorised repair normal wear and tear and defects which have a negligible effect on the value or operation of the uni...

Page 20: ...0 3 3 BS EN 61000 4 2 BS EN 61000 4 3 BS EN 61000 4 4 BS EN 61000 4 5 BS EN 61000 4 6 BS EN 61000 4 11 EMF Directive 1999 519 EC BS EN 62233 RoHs Directive 2011 65 EU WEEE Directive 2012 19 EU IT IS H...

Reviews: