
- 14 -
Cont ...
5.24
Supply Cord Replacement:
The supply cord and internal wiring within the terminal
box are routed and secured to ensure compliance with the
electrical standard EN 60335-1. It is essential that prior to
any disturbance of this internal wiring, all cable routing and
securing details are carefully noted to ensure re-assembly to
the same factory pattern is always maintained.
If the supply cord is to be changed or is damaged, it must be replaced with a
special cord assembly available from Stuart Turner or one of their approved
repairers.
On disassembly note the cord retention and routing system. Re-assemble to the
same pattern.
For information on cable connection consult the wiring diagram and cable gland
fitting instructions.
5.25
Cable Gland Fitting Instructions:
To enable correct assembly of the cable gland the ‘O’-ring (Fig. 11 item 1) must
be placed over the cable before the clamping insert (Fig. 11 item 2) can be
tightened.
Note: Cable diameter range:- 9.2 mm to 11.9 mm.
5.26
Supply Cord Extension:
The pumps are fitted with a supply cord to the following specification:-
All models . . . . . . . . . . . . . . . . . HO7RN-F3 G 1.5 mm² - 10 Amp rated cable.
If the supply cord is to be extended, a cord of the same specification should be
used. Any connections or junction boxes used should be specifically suited for
the application and installed in accordance with the manufacturers instructions.
Fig. 11
2
1