
33
M2-D
Operating the M2 Unit
Site Setup & Pre-Check
SITE SETUP
CHECK
for overhead hazards if unloading the unit to the ground.
UNLOAD
the unit by using the sub frame lifting bale (marked) with appropriate equipment.
SET
and position the unit on solid level surface to avoid settling or upset.
SET
and position the unit to have a clear unobstructed working area of 10ft (3m) on all 4
sides.
CONNECT
and secure
all hoses onto the unit according to your layout.
SECURE
the truck and/or the trailer that the unit is mounted on, from movement.
PROTECT
any hoses connected between the M2, the tank, and drill rig, from possible
damage or from being driven upon by a vehicle.
UNIT PRE-CHECK
READ
engine operators manual for proper starting and running procedures.
CHECK
to ensure the engine oil level is correct. Refer to the engine operator manual
supplied.
CHECK
to ensure the air filter is clean (replace if necessary). Refer to the engine operator
manual supplied.
CHECK
to ensure the fuel tank is full and the shut off valve is open. Refer to the engine
operator manual supplied.
CHECK
to ensure the grease cup on the pump is full of grease and the winged/lugged nut
on the top, is backed off to allow the shaft to retract into the grease cup.
CHECK
to ensure any valves installed on the suction intake line between the tank and
centrifugal pump are open.
CHECK
to ensure there is sufficient fluid in the tank, to insure the centrifugal pump does
not run dry.
CHECK
to ensure the centrifugal pump is primed.
CHECK
to ensure the ball valve on the filter housing connected to the “tank jets” is open.
CHECK
to ensure the ball valve on the filter housing connected to the drill rig is closed.
CHECK
to ensure the small ball valve on the Wash Wand is closed.
CHECK
that the hopper valve is closed.
Summary of Contents for M2-D2
Page 2: ...2 This page left blank intentionally...
Page 12: ...12...
Page 17: ...17 M2 D Identifying Your Machine Components Location of Tags and PIN Plates...
Page 18: ...18 SECTION II Description Care and Maintenance...
Page 30: ...30 SECTION III Set up and Installation of Unit in Detail...
Page 32: ...32 SECTION IV Operating the M2 Unit...
Page 41: ...41 SECTION V Troubleshooting the M2 Unit...
Page 44: ...44 SECTION VI Periodic Maintenance Repair Information...
Page 49: ...49 SECTION VII OEM Repair Information...
Page 63: ...63...
Page 64: ...64...
Page 65: ...65...
Page 66: ...66 SECTION VIII Parts Manual...