![Stryker Secure Connect Connected Hospital 5212 Operation & Maintenance Manual Download Page 11](http://html1.mh-extra.com/html/stryker/secure-connect-connected-hospital-5212/secure-connect-connected-hospital-5212_operation-and-maintenance-manual_1385696011.webp)
± 0.5 in. (± 1.3 cm)
4 in. - 5 in. (10.2 cm - 12.7 cm)
D
E
F
G
F
Fiig
gu
urre
e 3
3 –– M
Mo
ou
un
nttiin
ng
g ssp
pe
ecciiffiicca
attiio
on
nss
6. Center the mounting plate (D) on the mark that was made in step 5 and use a pencil to mark the bottom of the mounting
plate (D) (Figure 3).
N
No
otte
e -- The bottom of the mounting plate must be 4 in. - 5 in. (10.2 cm - 12.7 cm) from the floor.
7. Using a level on the bottom of the mounting plate (D), make sure that the bottom of the mounting plate (D) is level when
you position the mounting plate (D) on the reference marks made in steps 5 and 6 (Figure 3).
8. Use a pencil to mark the three screw holes of the mounting plate (D).
9. Using the appropriate tool with the hospital supplied fasteners (E, not included), secure the mounting plate (D) to the
wall (Figure 3).
10. Attach the S
Se
eccu
urre
e C
Co
on
nn
ne
ecctt (F) to the mounting plate (D) (Figure 3).
11. Using a #2 Phillips screwdriver, secure the S
Se
eccu
urre
e C
Co
on
nn
ne
ecctt (F) to the mounting plate (D) with the two supplied screws
(700001126359) (G) (Figure 3).
12. Plug the S
Se
eccu
urre
e C
Co
on
nn
ne
ecctt power supply into a hospital grade protective earthed wall outlet.
N
No
otte
e -- Position the power supply in an accessible location.
13. On the S
Se
eccu
urre
e C
Co
on
nn
ne
ecctt, plug in the female end of the power supply.
14. On the S
Se
eccu
urre
e C
Co
on
nn
ne
ecctt, plug in the nurse call communication cable.
15. Using a #1 Phillips screwdriver, secure the nurse call communication cable to the S
Se
eccu
urre
e C
Co
on
nn
ne
ecctt.
16. Connect and secure the nurse call communication cable to the nurse call system wall plug.
17. Configure the S
Se
eccu
urre
e C
Co
on
nn
ne
ecctt, see
18. Follow the procedure in the product manual to connect the product to the S
Se
eccu
urre
e C
Co
on
nn
ne
ecctt.
C
CA
AU
UT
TIIO
ON
N -- Always match the dip-switches of a product to the head wall configuration if a nurse call communication
cable needs to be connected to avoid the risk of head wall damage.
N
No
otte
e
•
If a S
Se
eccu
urre
e C
Co
on
nn
ne
ecctt is moved, repeat steps 1 and 10-17.
•
If a product is moved to another configured S
Se
eccu
urre
e C
Co
on
nn
ne
ecctt, no change needs to be made as the product will
connect automatically.
5212-009-201 Rev A.0
7
EN
Summary of Contents for Secure Connect Connected Hospital 5212
Page 2: ......
Page 4: ......
Page 26: ...Torque item AC to 0 58 0 05 ft lb EN 22 5212 009 201 Rev A 0 ...
Page 31: ...Torque item AC to 0 58 0 05 ft lb 5212 009 201 Rev A 0 27 EN ...
Page 43: ......