P
Prro
occe
ed
du
urre
e::
1. Push down on the brake pedal to apply the brake.
2. On the footboard control panel, press E
En
ntte
err to access the S
Se
ettttiin
ng
gss menu.
3. Highlight S
Sh
hu
uttd
do
ow
wn
n and press E
En
ntte
err.
4. Unplug the power cord from the wall outlet.
5. Using a small flat head screwdriver, remove and save the four base cover screw caps.
6. Using a #2 Phillips screwdriver, remove and save the four screws that secure the base cover to the base frame.
Remove and save the base cover.
7. Using a #2 Phillips screwdriver, remove and save the two screws that secure the load cell board assembly to the base
weldment. Remove the load cell board assembly.
C
CA
AU
UT
TIIO
ON
N
•
Always use ESD protective equipment before opening antistatic bags and servicing electronic parts.
•
Do not place unprotected circuit boards on the floor.
8. Disconnect the communication cable and the two load cells from the load cell board assembly. Discard the load cell
board assembly.
9. Reverse steps to reinstall.
10. Recalibrate the scale (
11. Verify proper operation of the product before you return it to service.
L
Lo
oa
ad
d cce
ellll a
asssse
em
mb
bllyy rre
ep
plla
acce
em
me
en
ntt
T
To
oo
ollss rre
eq
qu
uiirre
ed
d::
•
#2 Phillips screwdriver
•
Small flat head screwdriver
•
Needle nose pliers
•
Ratchet
•
1/2” socket
•
Small floor jack
P
Prro
occe
ed
du
urre
e::
1. Push down the brake pedal to apply the brake.
2. On the footboard control panel, press E
En
ntte
err to access the S
Se
ettttiin
ng
gss menu.
3. Highlight S
Sh
hu
uttd
do
ow
wn
n and press E
En
ntte
err.
4. Unplug the power cord from the wall outlet.
5. Using a small flat head screwdriver, remove and save the four base cover screw caps.
6. Using a #2 Phillips screwdriver, remove and save the four screws that secure the base cover to the base frame
weldment. Remove and save the base cover.
7. Using a small floor jack, near the load cell that you need to replace, push downward on the jack’s lever to raise the lift
support tube upward.
8. Using needle nose pliers. remove and save the rue clip and pin from the base frame weldment.
9. Using a ratchet and 1/2” socket, remove and save the two bolts that secure the load cell assembly to the base frame
weldment..
N
No
otte
e -- When you reinstall the load cell assembly, orient the load cell assembly up, so you can secure the bolts by hand
to start.
10. Using needle nose pliers, remove the load cell assembly from the base frame weldment.
EN
32
5900-009-002 Rev A.0
Summary of Contents for MV3 5900
Page 2: ......
Page 23: ...C Ca ab blle e r ro ou ut tiin ng g 5900 009 002 Rev A 0 19 EN ...
Page 41: ...20 9 19 18 9 51 2X 8 9 12 9 8 46 51 21 9 9 21 42 42 43 5900 009 002 Rev A 0 37 EN ...
Page 47: ...DETAIL C 17 2X 18 2X 2 2X 10 6X DETAIL D 19 3X 7 6 5 6 6 5 5900 009 002 Rev A 0 43 EN ...
Page 53: ...16 16 10 10 11 24 19 20 25 5900 009 002 Rev A 0 49 EN ...
Page 54: ...18 18 18 18 17 17 23 23 EN 50 5900 009 002 Rev A 0 ...
Page 55: ...7 15 15 15 7 5900 009 002 Rev A 0 51 EN ...
Page 62: ...17 17 23 24 21 20 22 22 22 22 EN 58 5900 009 002 Rev A 0 ...
Page 63: ...8 17 17 17 17 30 29 9 17 17 18 19 19 5900 009 002 Rev A 0 59 EN ...
Page 64: ...12 75 0 125 2x 1 75 0 125 2x 28 28 EN 60 5900 009 002 Rev A 0 ...
Page 65: ...28 28 32 32 5900 009 002 Rev A 0 61 EN ...
Page 66: ...26 26 26 26 10 25 25 EN 62 5900 009 002 Rev A 0 ...
Page 73: ...3 2 16 4X 16 5900 009 002 Rev A 0 69 EN ...
Page 80: ...10 9 9 19 19 21 22 20 21 22 18 EN 76 5900 009 002 Rev A 0 ...
Page 81: ...23 23 27 27 5900 009 002 Rev A 0 77 EN ...
Page 82: ...11 11 8 EN 78 5900 009 002 Rev A 0 ...
Page 88: ...2 1 21 4X 7 4X 13 15 7 4X 15 12 EN 84 5900 009 002 Rev A 0 ...
Page 132: ...0 00 03 39 9 2 25 54 4 0 00 00 0 0039 254 000 1 EN 128 5900 009 002 Rev A 0 ...
Page 134: ...5 59 90 00 04 40 00 00 03 38 8 A A 5900400038 1 EN 130 5900 009 002 Rev A 0 ...
Page 135: ...5 59 90 00 04 47 70 00 01 17 7 A A 5900470017 1 5900 009 002 Rev A 0 131 EN ...
Page 137: ......