TECHNICAL PASSPORT, INSTALLATION AND MAINTENANCE INSTRUCTION

 

 

get hotter, cylinder becomes longer and lowers the valve. When indications of thermometer 

becomes  stable  under  80  °C,  slightly  open  the  valve  by  using 
temperature adjustment bolt (2) if temperature is higher than 80 °C 

– 

slightly  close  it  till  temperature  falls  under  80  °C.  Later,  if  the 
temperature  is  too  low,  turn  the  adjustment  bolt  so  that  valve  would 
be lifted, if temperature is too high, turn the bolt to opposite direction 
closing  the  valve.  Also  adjust  the  marking  ring,  so  that  you  would 
know  the  position  of  valve  (Fig.15  C),  for  example:  it  is  advisable to 
close  the  valve  when  removing  ash.  We  want  to  remind  you  that 
boiler operation temperature must be 70 

– 90 °C. 

 

Manufacturer  has  the  right  to  complement  the  boiler  with 
thermostatic draught regulator (Fig. 16).  
 

 

7.4 

ASSESSMENT OF BOILER OPERATION 

 

a)  If after ignition, boiler works correctly, but later its power and draft decreases it means that flue 

is not sealed properly: check if door for flue cleaning is closed or if there are other openings, 
eliminate them. 

b)  If after ignition of fuel you hear rhythmic noise and occasionally see smoke coming out it 

means that flue draft is to strong 

– boiler is unable to attain its power and works very 

inefficient-ly: in this case you need to let in some air into flue through special opening on 
horizontal con-nection. Metal band flue ring must be pushed till the pulsation of boiler 
disappears (see Fig. 10). 

c) 

If  fuel  is  burning  well,  but  temperature  increases  very  slowly  and  there  is 
condensation leaking out of flue it means that the flow of heated water going through 
boiler  is  excessive:  Set  circulation  pump  to  the  bottom  position  and  reduce  the  flow 
with help of boilers balance tap or reduce the flows in heating elements till there will 
be no more condensation leaks and thermo-meter will show 70 

– 80 °C. 

 

7.5 

CLEANING AND MAINTAINING THE BOILER 

 

When  using  firewood,  you  must  remove  the  ashes  every  month.  When  using  peat  and 

coal,  ash  must  be  removed  each  time  before  firing.  Naturally  some  resin  accumulates 
insides  the  boiler,  amount  of  resin  increases  when  flue  draft  is  incorrect;  when  air  gets  in 
through  bottom  or  through  bottom  ash  removal  doors  (11)  (Fig.  1);  when  at  the  time  of 
burning,  fuel  is  added  constantly and  air distributor  is lifted;  when heated  water flow is  too 
high. 

 

If draft decreases, openings between air heating chamber (4) (Fig. 1) and inner boiler walls  

need to be inspected and cleaned. They can be cleaned with a flexible brush through inner 
smoke opening 

(5) 

(Fig. 1) above fuel loading doors (8) (Fig. 1). It is most convenient to 

clean through the smoke outlet (5) (Fig. 1) (after dismantling the connection with flue), or 
through special opening in the connection itself. 

Boiler will not become clogged up if 

heating system is correctly installed, flue is well preserved and used according to 
instructions

.  

Air  distributor  (9)  (Fig.  1)  can  scoop  some  ash  when  it  is  lowered,  so  its  openings 

sometimes need to be checked and cleaned. 

 

Lifting  cord  mechanism  (12)  (Fig.  1), 

must  be  oiled  so  that  it  wouldn’t  wear  out  and 

Figure 16 

Summary of Contents for BIO S10 U

Page 1: ...STROPUVA TECHNICAL PASSPORT INSTALLATION AND MAINTENANCE INSTRUCTION Solid fuel boiler for central heating...

Page 2: ...ther boiler water heater and floor heating 13 6 3 Connection diagram of Stropuva boiler to another boiler water heater radiator floor heating 14 6 4 Connection diagram of Stropuva boiler to another bo...

Page 3: ...m2 1 1 MAIN TECHNICAL SPECIFICATIONS Fuel used firewood wood residue sawdust briquettes peat briquettes coal pellets Recommended fuel moisture up to 30 Model of boiler S7 S10 S12 S20 S30 S40 S7 BIO S1...

Page 4: ...ound and the chimney mm 991 1413 5 1302 1550 1285 1549 991 1413 5 1302 1550 1285 1549 1494 1302 1673 5 1285 1664 Dimensions mm 1900 1900 1900 1900 1900 1900 h d 1330 450 1900 450 1700 550 2100 550 170...

Page 5: ...arger diameter steel cylinder which provides thermal insulation Heated water resides between these two cylinders There is a draft regulator on the front side of the boiler 2 see 7 3 The construction h...

Page 6: ...rpose is to correctly distribute air in generation zones located below and next to air distributor as well as in combustion zones located near and above the distributor Air distributor 9 Fig 1 rests u...

Page 7: ...at the bottom of the boiler inside the lower doors 11 Fig 1 Fire grates 19 Fig 1 Fig 7 can be found by opening the ash removal doors 11 Fig 1 This part is attached in U boiler for additional air to go...

Page 8: ...boilers from overheating When water pressure reaches critical levels the valve opens up releasing the heated water into the sewerage at the same time adding cold water through the automatic system Va...

Page 9: ...nless steel will have to be used Rectangular liners are not as reliable because openings caused by temperature changes appear at the connections Boiler is placed directly on concrete floor When carryi...

Page 10: ...ple and proven diagrams We don t recommend building accumulative heat tanks because our boiler is more efficient while working in preservation mode than while charging accumulative tank in maximum pow...

Page 11: ...11 TECHNICAL PASSPORT INSTALLATION AND MAINTENANCE INSTRUCTION 6 HEATING SYSTEM DIAGRAM Figure 10 Stropuva...

Page 12: ...warmer than selected value Thanks to this pump P water loudly circulates through coil pipes F of floor heating also flows to boiler through distribution valve T 3 20 50 which when water from radiator...

Page 13: ...atic valve 1 pcs 7 Circulation pump installation kit D25 1 pcs 23 Valve 1 5 bar 1 pcs 8 Separable connection D25 V i 2 pcs F to out of floor heating 9 Automatic bleeding device 1 pcs B to out of water...

Page 14: ...cs 21 Adapter D32 x D25 2 pcs 7 Circulation pump installation kit D25 1 pcs 22 Thermostatic valve 1 pcs 8 Separable connection D25 V i 2 pcs 23 Valve 1 5 bar 1 pcs 9 Automatic bleeding device 1 pcs F...

Page 15: ...lbow D25 x D15 3 pcs 18 Filling valve i i 1 2 1 pcs 7 Circulation pump installation kit D25 8 Separable connection D25 V i 1 pcs 2 pcs 19 Release valve 1 2 20 Brass disc valve V V 1 21 Adapter D32 x D...

Page 16: ...ets and sawdust briquettes immediately ignite so that the load of fuel would not be ignited by leftover ember Before igniting the boiler carefully read the instruction of traction regulator see sectio...

Page 17: ...all down to the bottom Coal load must not be larger than up to the fuel loading door 8 Fig 1 Put firewood about 2 kg on top of coal and ignite it After ignition switch valve 6 Fig 1 must be lifted of...

Page 18: ...disappears see Fig 10 c If fuel is burning well but temperature increases very slowly and there is condensation leaking out of flue it means that the flow of heated water going through boiler is exces...

Page 19: ...ll stick deeper into fuel its lifespan will be reduced significantly Most common installation mistakes Consequences Troubleshooting 1 Installed using other boiler manufacturer diagrams 1 High flow coo...

Page 20: ...diagrams According to Figure 10 we recommend connecting gravity controlled radiator a radiator without thermos valve Hot water goes through balance tap bk1 Fig 10 to the nearest radiator which can wor...

Page 21: ...ts No need to move the boiler and repeatedly connect to the chimney or heating system Usually no need to make changes in the heating system This solutions allows a complete automatization of firing pr...

Page 22: ...fuel boiler STROPUVA 1 pcs Safety pressure valve 1 5 bar 1 pcs Thermometer 1 pcs Deflectors 2 pcs Air injection collector 1 pcs Air distributor 1 pcs Fire grate 1 pcs Technical passport 1 pcs PACKAGE...

Page 23: ...c procedures inspection of boiler and control elements at least once a year To preserve warranty agreement and its entries We recommend that the installation assessment the first start up adjustment o...

Page 24: ...aris Trak distr LT 25144 Lithuania tel 370 525 51763 Boiler model Product number Date of sale Signature Stamp SELLER Date of sale Signature Stamp PERSON RESPONSIBLE FOR INSTALLATION Installation addre...

Page 25: ...e Surname Signature The boiler has a year warranty If the heat exchanger is broken seller has to fix the boiler on its own expense but if other components are broken not due to the fault of the end us...

Page 26: ...JSC Stropuva ir ko company code 300149972 K stu io g 1A Lentvaris Trak distr LT 25144 Tel 370 5 255 17 63 mob 370 656 08961 www stropuva lt info stropuva lt...

Reviews: