www.stromltd.com
STROM LIMITED
2020
38
Electric Boilers
ELECTRICIANS CHECKLIST
ELECTRICIAN TO COMPLETE...
COMPANY NAME:
ELECTRICIANS NAME:
COMPANY ADDRESS:
COMPANY TELEPHONE:
DATE OF INSTALLATION:
WHAT IS THE INCOMING MAINS VOLTAGE AT THE FUSE BOARD? VAC
WHAT IS THE INCOMING MAINS VOLTAGE AT THE APPLIANCE? VAC
WHAT SIZE BREAKER HAS BEEN FITTED FOR THE BOILER? AMPS
WHAT IS THE DRAW OF THE APPLIANCE FOR HEATING? AMPS
WHAT IS THE DRAW OF THE APPLIANCE FOR HOT WATER? AMPS
WHAT SIZE CABLE WAS INSTALLED TO THE APPLIANCE? . MM
2
WHAT IS THE APPROXIMATE CABLE RUN TO THE BOILER? M
WHAT TYPE OF CABLE HAS BEEN USED?
NOTES:
BY SIGNING YOU AGREE THAT YOU HAVE INSTALLED THE BOILER IN ACCORDANCE WITH THIS MANUAL
AND THAT THE BOILER IS WORKING AS INTENDED WITHOUT ANY LEAKS AND ALL INSTALLER MADE AND
FACTORY MADE CONNECTIONS HAVE BEEN CHECKED.
SIGNED: DATE: