8
TECHNICAL INFORMATION
SIDE VIEW
C
G
B
R1
R3
R1
F
A
E
R2
D
H
Biotec
TOTAL WIDTH WITH
HOPPER
TOTAL
DEPTH
B
HEIGHT
C
FLUE
SPIGOT
D
BOILER
BODY WIDTH
E
RETURN
HEIGHT
F
FLOW
HEIGHT
G
FLUE
HEIGHT
HR
TOTAL
WIDTH
A
25
1226 (200LTR HOPPER)
870
1610
130
500
269
1132
1304
1380
40
1560 (300LTR HOPPER)
1104
1660
130
708
254
1301
1311
1608
It will be necessary to fit an adapter in the Flue pipe con-
nection to increase the Flue diameter to the required mini-
mum Flue diameter of 150 mm (as previously stipulated)
to comply with U.K. regulations
BIOTEC R1
R2
R3
Flow & Return Vent
Drain
25
1”
½”
¾”
40
1
¼
”
½”
¾”
Service & Fill Clearances
PLAN
500mm
700mm
700mm
STREBEL
700mm
500mm
Dimensions