
STRATUS Floor Plate 2 post Lift Installation & Operation & Maintenance Instructions
5
1. Packing, transport and storage
All packing, lifting, handling, transport and unpacking operations are to be performed exclusively by expert
personnel with knowledge of the lift and the contents of this manual.
1.1 Packing
The packing of the lift is delivered in following components:
• 1 base unit packed in a steel frame, wrapped up in non-scratch material, including all the accessories.
• 1 power unit packed in a carton box.
1.2 Transport
See Fig 1, packing can be lifted or moved by lift trucks, cranes or bridge cranes. In case of slinging, a second
person must always take care of the load, in order to avoid dangerous oscillations.
During loading and unloading operation, goods must be handled by vehicles or ships.
At the arrival of the goods, verify that all items specified in the delivery notes are included. In case of missing parts,
possible defects or damage due to transport operations.
If finding missing parts, possible defects or damage due to transport, one should examine damaged cartons
according to <<Packing List.>> to verify the condition of damaged goods and missing parts, also the person in
charge or the carrier must be immediately informed.
The machine is heavy goods! Don
’t take manpower load and unload and transporting way into consideration, the
safety of working is important.
Furthermore, during loading and unloading operation goods must be handled as shown in the picture. (Fig 1)
Fig 1
1.3 Storage
The machine equipment should be stocked in the warehouse, if stocked outside should do the disposal well of
waterproof.
Use box truck in the process of transport, use container storage when shipping.
The control box should be placed perpendicularly during the transport; and prevent other goods from extrusion.
The temperature for machine storage: -10ºC-- 40ºC