![Stratus SAE-F10P Installation, Operation & Maintenance Instructions Manual Download Page 15](http://html1.mh-extra.com/html/stratus/sae-f10p/sae-f10p_installation-operation-and-maintenance-instructions-manual_1383753015.webp)
STRATUS Floor Plate 2 post Lift Installation & Operation & Maintenance Instructions
15
Note: Anchor bolts driven into the ground at least 150mm.
Drilling
Cleaning
Bolting
Fig. 7
5.7 Routing the equalizer cables
The equalizer cables should be checked weekly for equal tension. Failure to do this will cause uneven
lifting. The cables should always be adjusted so that they are equal tension when resting on the safety
locks.
•
Use an appropriate lifting equipment to raise the carriage to the first latch position. Be sure the carriage is
engaged securely before attempting to route the equalizer cables. Carriages must be equal height from the
floor before proceeding;
•
With the carriages in equal height, fit the cable end-ups through the small holes of the carriages (ref. fig. 8):
•
Route the equalizer cables referring to the diagram (fig. 8). Make sure the cables in the place on the pulleys.
Make sure the cables routed properly;
•
After the equalizer cables have been routed, adjust the nuts M12 to make each cable in equal tension;
The strength plate of carriage
Pass through the cable from
the bottom to the top of two
strength plate of the carriages.
Fig. 8