Grounding Requirements
Electrical Power Planning
2-15
Grounding Requirements
W A R N I N G
!
Incorrect grounding can cause severe personal injury
and extensive equipment damage.
The ftServer system obtains its protective earth (PE) ground through the power cord.
See
“Grounding Considerations” on page B-1
for a more complete discussion of
ftServer system grounding.
Table 2-13. Power Cords to Connect PDUs Directly to AC Power Mains
Marketing ID
Plug Type
Rating
Length
Locale
B50154F
IEC 60320 C19 to IEC 60309
20A/250V
15 ft
International
B50171F
IEC 60320 C19 to NEMA L6-20P
16A/250V
15 ft
North America
B50175F
IEC 60320 C19 to NEMA L6-20P,
PSE approved
20A/250V
15 ft
Japan locking
power cord
Table 2-14. AC Power Cords to Connect PDUs to a UPS
Marketing ID
Plug Type
Rating
Length
Locale
B50171F
IEC 60320 C19 to NEMA L6-20P
16A/250V
15 ft
North America
B52700F-45M
IEC 60320 C19 to IEC 60320 -C20
20A/250V
4.5m
International
B50175F
IEC 60320 C19 to NEMA L6-20P,
PSE approved
20A/250V
15 ft
Japan locking
power cord
Table 2-15. System Power (Jumper) Cables to Connect ftServer Systems to PDUs
Marketing ID
Plug Type to System
Plug Type to PDU
Rating
Length
B50502F
IEC 60320 C13
IEC 60320 C14
10A/250V
2.0m
B50503F
IEC 60320 C13
IEC 60320 C14
10A/250V
2.0m
Summary of Contents for ftServer 2600
Page 1: ...Stratus Technologies R638 02 Stratus ftServer 2600 4500 and 6300 Systems Site Planning Guide...
Page 8: ...Tables viii Stratus ftServer 2600 4500 and 6300 Systems Site Planning Guide R638...
Page 48: ...Planning for Cables 3 4 Stratus ftServer 2600 4500 and 6300 Systems Site Planning Guide R638...
Page 70: ...Monitor Requirements 6 6 Stratus ftServer 2600 4500 and 6300 Systems Site Planning Guide R638...
Page 98: ...Index Index 4 Stratus ftServer 2600 4500 and 6300 Systems Site Planning Guide R638...