48
Translation of the original instruction
Adjusting the storage tank height
Removing the storage tank
For transport, the storage tank can be taken off the base
frame by loosening these 2 ring screws.
Caution: Before loosening the ring screws, secure the
storage tank against dropping! The gear motor juts out!
Re-assemble in reverse order. Make sure the ring screws
are securely fastened!
Ring screws
Storage tank height adjustment
The flow mixer can be operated at 2 working heights:
a) 1,060 mm filling height (factory preassembled)
b) 860 mm filling height
To lower or raise the storage tank, proceed as follows
Lowering:
To lower the storage tank, first remove it as described in
Section 6.1.
The 2 frame elements can be folded in (see Fig. 4) by
releaseing the 2 ring screws (see Fig. 1) and safety split
pins from the load braces (see Fig. 2) and folding in the
load braces (see Fig. 3).
The storage tank can now be refitted and secured with
the 2 ring screws. Insert the 2 safety split pins into the
split pin holes for safe keeping.
Make sure the ring screws are securely fastened!
Fig. 1
Fig. 2
Safety split pin
Fig. 4
Load brace
Fig. 3
Summary of Contents for DMS 25 PRO
Page 62: ...62...