14 - English
0
0
0
0
0
0
0
0
ASSEMBLY
STEP 9: INSTALLING THE WARMING RACK
See Figure 14.
Fully raise the hood.
Lay the warming rack in the grooves on each side of the
hood and lock it into the rear pilot holes as shown.
Fig. 14
WARMING
RACK
GROOVES
PILOT
HOLE
STEP 10: INSTALLING SIDE SHELVES
See Figures 15 - 16.
To install the utility bar onto the side shelf:
Line up holes in right utility bar (Z) and trim washers (A1)
with holes on the right side shelf (D).
Insert bolt, M6 x 15 mm (EE), and lock washer, M6 (BB),
through the hole in the shelf, through the trim washer and
into the end of the bar.
On the right side shelf only, place the match stick chain
and lock washer between the bolt and shelf.
Repeat steps for other side.
To install the side shelf:
Loosen the screws on each side of the firebox.
Slide the keyhole slots in the side shelf over the screws.
Securely tighten the screws.
BRACKET
RIGHT UTILITY
BAR (Z)
BOLT (EE)
BOLT (EE)
RIGHT SIDE SHELF (D)
TRIM WASHER
(A1)
0
0
0
0
Fig. 16
LEFT SIDE
SHELF (A)
SCREW
Fig. 15
KEY HOLES
LEFT
SIDE
SHELF
(A)
LOCK
WASHER (BB)
MATCH STICK CHAIN
AND LOCK WASHER (BB)
(RIGHT SIDE ONLY)