background image

©  stilum GmbH, Gewerbegebiet Larsheck, 56271 Kleinmaischeid  •  Tel. +49 (0) 2689 92790-0  •  Alle Rechte und Produktmodifikationen vorbehalten

Stand: 29/04/2015 · S. 2

Mounting instructions for climbing equipment „collis“ 

Artikel-Nr. 515511401

Diagramm 3b: Top view foundationplan








































































































































Foundation

Diagramm 2: Rear view with dimension details „collis“

Diagramm 3a: Rear view foundationplan

4000

300

2000

3700

1800

4350

Collis

Edelstahlrohr Ø 60,3 x 3,65mm

Netz Aus Herkulestau Maschenweite

größer 240 x 380 mm

Lichte Maße zwischen 

den Rohren 360 mm

Edelstahlrohr Ø 42,4 x 3,25mm

1
2

1:40

 

 

 

 
 

 
 

 

 
 

 

 
 

 

 

1

4

3

2

A

E

D

C

B

F

 

 

 

-0,3

+0,3

BLATT:

OHNE SCHRIFTLICHE ZUSTIMMUNG DER C KAISER GMBH DARF DIESE TECHNISCHE UNTERLAGE WEDER VERVIELFÄLTIGT 

NOCH DRITTEN MITGETEILT ODER ZUGÄNGLICH GEMACHT WERDEN NOCH IN SONSTIGER WEISE MISSBRÄEUCHLICH VERWENDET 

WERDEN. ZUWIDERHANDLUNGEN WERDEN URHEBERRECHTLICH VERFOLGT.

VON:

WERKSTUECKKANTEN

NACH DIN 6784

OBERFLAECHEN NACH

DIN ISO 1302 REIHE 2

ZUL. ABWEICHUNG

DIN 2768 - mH

MAßSTAB:

WERKSTOFF / ROHMAß:

DATUM:

NAME:

GEZ:

GEPR:

FREIG:

BENENNUNG:

ZG-NR:

KUNDE:

Gewerbegebiet Larsheck

56271 Kleinmaischeid

Deutschland

Play level

Foundation








































































































































1.  Select the play equipment location in consideration of the required safety 

area (see Diagram 3: 7600mm x 7300mm).

2.  Carry out excavation work for foundation as shown in Diagram 2, 3. After 

excavation, compress the foundation floor. 

Note: 

Cover the foundation holes with the safety cover required for the height 

of fall indicated.The combination equipment is built in on the play level. Pay 
attention to items marked „game level” of play equipment!

3.  Set up the 2 main concrete foundations in the quality class C 20/25. 

4.  After a setting period of 10-14 days, depending on weather conditions and 

foundation size - clean the surface of the foundations and start with the instal-
lation of the combination equipment. 

5.  Place the equipment as shown in the overview and in the Diagram 2a on the 

main foundation and do a rough aligning.  

Note: Do not screw the base plates onto the foundations yet!

6.  Connect the slide at the intended locations acc. to the Diagram 4. Please 

fasten the parts using the screws including in the delivery.

Reinforcement plan:

Concrete foundation with reinforcement
Main foundation: BSt 500S 
Ever 4 stirrups Ø 8 mm lengthwise and cross 
Concrete cover h´= 3 cm
Concrete quality class C 20/25
Foundations for attachment parts are no-reinforced

Summary of Contents for collis

Page 1: ...echte und Produktmodifikationen vorbehalten Stand 29 04 2015 S 1 Mounting instructions for climbing equipment collis Artikel Nr 515511401 climbing net connection pipes 2 pieces ladder bow screws M10 side bow Diagramm 1 Overall view play equipment with description of individual elements ...

Page 2: ... foundation floor Note Cover the foundation holes with the safety cover required for the height of fall indicated The combination equipment is built in on the play level Pay attention to items marked game level of play equipment 3 Set up the 2 main concrete foundations in the quality class C 20 25 4 After a setting period of 10 14 days depending on weather conditions and foundation size clean the ...

Page 3: ...ment at the foundations 4 Drill holes into all foundations and screw the play equipment into the founda tions with the included heavy duty dowels 5 Seal the foundation with the safety cover required for the height of fall indicated Critical drop height 1900 mm Recommended surface material sand bark mulch gravel synth fall protec tion 6 After 3 months check the screws at the joints and retighten th...

Page 4: ...f maintenance of the stainless surface even despite of their corrosion resistance Especially areas which can not be reached by rainfall should be frequently cleaned from dirt and deposits due to air pollution and dirt caused by the atmosphere Light soiling can easily be removed by using a high pressure cleaner For persistent deposits use a clean cloth moistened with a special liquid cleaner e g on...

Reviews: